Grundfos 160S SP 6 in Submersible Pump End

HP - Motor Dia: 2 HP - 4 in Motor
Model - Head: 160S20-1 - 39 ft at 160 GPM

Product variant with selected options does not exist!

Price
$2,730.53
SKU: 93138223
Weight : 16.0 lb
Loading locations...
Free Shipping $499 or more
Skip the chatbot. Talk to an expert.
1-888.510.4036 ¡ Same-day shipping available
Description
Grundfos ¡ Submersible Pump End
160S SP 6 in Pump End
160 GPM class stainless steel SP pump end, motor not included: 30 builds for 2 to 75 HP motors, on 4, 6 and 8 in motors.
160 GPM Rated Flow
2-75 HP
39-1584 ft Nominal Head
3 in NPT Discharge
4, 6 and 8 in Motor Fit
Grundfos Motor Flange
Built-In Check Valve
AISI 304 Stainless Steel
cCSAus
12.3-286.6 lb Weight
What Ships and What It Needs to Run

Included: the Grundfos 160S SP pump end with its built-in check valve; sleeve builds come built into a stainless steel sleeve with an NPT male discharge.

Submersible motor required, ordered separately. The pump end mounts on a 4 in, 6 in or 8 in submersible motor with a Grundfos motor flange, plus the motor’s control: a control box for a single-phase 3-wire motor, or a starter or drive for a three-phase motor. The motor horsepower and diameter for each build are in the Models & Ratings table.

Overview

The Grundfos 160S is the 160 GPM class of the SP 6 in submersible range, sold here as the pump end alone: stainless steel chambers and impellers with a built-in check valve, ready to mount on a submersible motor. Pump and impellers are AISI 304 stainless steel. Use it to rebuild an SP installation on a sound motor, or to build a pump around a motor you already have; the complete 160S pumps with Grundfos motors are listed separately.

Every 160S pump end has a Grundfos motor flange. Match the motor horsepower and diameter in the selector; send us the motor model and we will confirm the fit.

Genuine Grundfos equipment, factory-new in original packaging — sold and supported by Watermain Supply, an independent industrial supplier.
Warranty

24 months from date of installation, but not more than 30 months from date of manufacture. In Grundfos's words, products are “warranted to the original user only to be free of defects in material and workmanship”; the full terms are in the installation and operating instructions on the Data Sheet tab.

Single Pump or a Set?

Each pump end builds one pump for one well. For a duty/standby pair, or a flow outside the 160S range, send us the duty: the SP 6 in pump ends run from 90 to 300 GPM, and we will size the set with you.

Check the Part Number

The model code reads flow class, horsepower and stages: 160S250-14 is the 160S for a 25 HP motor with 14 stages. In the selector, choose the motor horsepower and diameter first, then the model; each model shows the head it adds at its rated flow. Order by part number; every build is in the Models & Ratings table.

  • 160S500-29, 160S600-31, 160S600-33, 160S600-36, 160S750-39: built into a stainless steel sleeve and supplied with an NPT male discharge (Grundfos price list and Product Center).
  • Several models come in more than one motor size under different part numbers; the selector shows the motor size with the horsepower.
  • 160S75-4 (part 92910850) is printed as 160S100-4 at 10 HP; Product Center (5.5 kW) and the data booklet give 160S75-4 at 7-1/2 HP; it is listed here as 160S75-4.
  • 160S75-4 (part 92910845) is printed as 160S100-4 at 10 HP; Product Center (5.5 kW) and the data booklet give 160S75-4 at 7-1/2 HP; it is listed here as 160S75-4.
  • 160S400-24 (part 93138251) is printed as 160S500-24; the price list HP column (40) and Product Center give 160S400-24; it is listed here as 160S400-24.
Models & Ratings
Model Part No. Motor HP Motor Discharge Min. Well Nominal Head at 160 GPM, ft Net Weight, lb
160S20-1 93138223 2 4 in 3 in NPT female 6 in 39 12.3
160S50-2 92910844 5 4 in 3 in NPT female 6 in 78-79 16.5
160S75-3 93138224 7-1/2 4 in 3 in NPT female 6 in 118 20.9
160S75-4 92910850 7-1/2 4 in 3 in NPT female 6 in 154 25.1
160S75-4 92910845 7-1/2 6 in 3 in NPT female 6 in 155-156 26.2
160S100-5 93138225 10 4 in 3 in NPT female 6 in 195 29.5
160S100-5 92910843 10 6 in 3 in NPT female 6 in 195-196 30.4
160S150-6 93138226 15 6 in 3 in NPT female 6 in 238-239 34.6
160S150-7 93138227 15 6 in 3 in NPT female 6 in 276-277 39.0
160S150-8 92910840 15 6 in 3 in NPT female 6 in 313-314 43.2
160S150-9 93138228 15 6 in 3 in NPT female 6 in 357-359 47.6
160S200-10 93138229 20 6 in 3 in NPT female 6 in 395-397 51.8
160S200-11 93138240 20 6 in 3 in NPT female 6 in 431-435 56.0
160S200-12 93138241 20 6 in 3 in NPT female 6 in 477-479 60.4
160S250-13 93138243 25 6 in 3 in NPT female 6 in 514-517 64.6
160S250-14 93138244 25 6 in 3 in NPT female 6 in 550-554 69.0
160S250-15 93138245 25 6 in 3 in NPT female 6 in 592-596 73.2
160S300-16 93138246 30 6 in 3 in NPT female 6 in 628-633 77.4
160S300-17 93138247 30 6 in 3 in NPT female 6 in 664-670 81.8
160S300-18 93138248 30 6 in 3 in NPT female 6 in 721 86.0
160S400-20 93138249 40 6 in 3 in NPT female 6 in 797 94.6
160S400-22 93138250 40 6 in 3 in NPT female 6 in 871 103.2
160S400-24 93138251 40 6 in 3 in NPT female 6 in 954 111.8
160S500-26 93138252 50 6 in 3 in NPT female 6 in 1028 120.2
160S500-28 93138253 50 6 in 3 in NPT female 6 in 1100 128.7
160S500-29 93138254 50 6 in 3 in NPT male 8 in 1131 224.9
160S600-31 93138255 60 6 in 3 in NPT male 8 in 1209 235.9
160S600-33 93138256 60 8 in 3 in NPT male 8 in 1332 251.3
160S600-36 93138257 60 8 in 3 in NPT male 8 in 1467 269.0
160S750-39 93138258 75 8 in 3 in NPT male 8 in 1584 286.6

Part numbers, horsepower, motor size and minimum well: Grundfos US price list, effective January 1, 2026. Nominal head: Grundfos SP data booklet, 60 Hz, May 2026 (complete-pump tables for the same model and motor size; where two figures are shown, builds on different motors or voltages differ slightly). Discharge thread and net weight of the pump end: Grundfos Product Center.

Shared Specifications
Specification Value
Rated flow 160 GPM
Motor horsepower 2 to 75 HP
Motor 4 in, 6 in or 8 in submersible motor, Grundfos motor flange
Discharge 3 in NPT; male on sleeve builds
Minimum well 6 / 8 in (per build, Models & Ratings table)
Check valve Built in
Liquid temperature Up to 140°F (60°C) at the pump end; the motor sets the working limit
Approvals cCSAus; CULDWUS on the non-sleeve builds (Grundfos Product Center codes)
Curve tolerance ISO 9906
Included Pump end only; motor and its control ordered separately
Performance — Will It Do What You Need?

Every 160S is rated at 160 GPM. The nominal head in the Models & Ratings table is the total head Grundfos publishes for each model at that rated flow, in feet. Pick a model whose nominal head covers your pumping level plus the pressure you need at the surface (2.31 ft per psi) plus pipe friction.

Source: Grundfos SP data booklet, 60 Hz, May 2026 (SP 160S section). Performance conforms to ISO 9906. The 160S head and power curves are in the product images, and the 160S data sheet on the Data Sheet tab carries the full curves and tables.

Before You Buy — The Limits That Decide the Fit
Check What to confirm
Motor A 4 in, 6 in or 8 in submersible motor of the horsepower in the selector, with a Grundfos motor flange; ordered separately
Motor control Control box for a single-phase 3-wire motor; starter or drive for a three-phase motor
Well size Casing ID at least the minimum well for the build (Models & Ratings table); sleeve builds need an 8 in well
Duty point Choose the model from the Grundfos curve at your flow and total head. Send us the pumping level, pipe run and pressure and we will check it against the curve
Materials of Construction
Part Material
Pump Stainless steel, EN 1.4301 (AISI 304)
Impellers Stainless steel, EN 1.4301 (AISI 304)

Source: Grundfos Product Center.

For engineering-led sizing and selection support or a factory submittal, email sales@watermainsupply.com or call 1-888.510.4036.
© Watermain Supply — A division of E4 Industrial LLC
Data Sheet
Videos

Product videos are being added to this listing. For a walkthrough in the meantime, email sales@watermainsupply.com.

You May Also Like