Grundfos 475S SP 8 in Submersible Pump End

HP - Motor Dia: 7-1/2 HP - 6 in Motor
Model - Head: 475S75-1A - 51 ft at 475 GPM

Product variant with selected options does not exist!

Price
$2,432.74
Coupon 5% off applied automatically in your cart. No code needed.
SKU: 192500A1
Weight : 72.0 lb
Loading locations...
Free Shipping $499 or more
Skip the chatbot. Talk to an expert.
1-888.510.4036 · Same-day shipping available
Description
Grundfos · Submersible Pump End
475S SP 8 in Pump End
475 GPM class stainless steel SP pump end for 8 in and larger wells, motor not included: 25 builds for 7-1/2 to 125 HP Grundfos 6 in and 8 in motors.
475 GPM Rated Flow
7-1/2-125 HP
51-831 ft Nominal Head
6 in NPT Discharge
8 in Min. Well
6 and 8 in Motor Fit
Grundfos Motor Flange
Built-In Check Valve
AISI 304 Stainless Steel
7.0-8.1 in Dia x 24.3-85.3 in L
33-132 lb Ship Weight
Overview

The Grundfos 475S is the 475 GPM class of the Grundfos SP 8 in submersible range, sold here as the pump end alone: AISI 304 stainless steel chambers and impellers, a built-in check valve and a 6 in NPT discharge, ready to mount on a Grundfos 6 in or 8 in submersible motor. Use it to rebuild an SP 475S on a sound motor, or to build a pump around a motor you already have; the complete Grundfos 475S SP 8 in Submersible Well Pump is listed separately.

Builds to 40 HP run on a 6 in motor; 40 to 60 HP builds come for a 6 in or an 8 in motor under separate part numbers, and 75 HP and up take an 8 in motor. Choose horsepower and motor size first, then the model, shown with the head it adds at 475 GPM.

What Ships and What It Needs to Run

Included: the Grundfos 475S SP pump end with its built-in check valve.

Submersible motor required, ordered separately. A Grundfos 6 in or 8 in motor of the horsepower in the selector: Grundfos MS6000C and MMS6 6 in Submersible Motor or Grundfos MMS8000 and MMS10000 Submersible Motor; the motor part number for each build is in the Motor by Horsepower table under Models & Performance.

Magnetic starter or drive required, ordered separately. Every motor for this pump end is three-phase; wire it through a starter or a drive (VFD) rated for its horsepower.

Drop cable and splice kit: sized to your setting depth and ordered separately.

Genuine Grundfos equipment, factory-new in original packaging — sold and supported by Watermain Supply, an independent industrial supplier.
Warranty

24 months from date of installation, but not more than 30 months from date of manufacture. In Grundfos's words, products are “warranted to the original user only to be free of defects in material and workmanship”; the full terms are in the installation and operating instructions on the Data Sheet tab.

Specifications
Specification Value
Rated flow 475 GPM
Motor horsepower 7-1/2 to 125 HP
Motor Grundfos 6 in (MS6000C, MMS6) or 8 in (MMS8000), Grundfos motor flange
Discharge 6 in NPT
Minimum well 8 in
Check valve Built in
Minimum submergence 8 ft
Curve tolerance ISO 9906 Annex A
Included Pump end only; motor and its control ordered separately

Source: Grundfos SP 475S data sheet, 60 Hz, and Grundfos US price list, January 2026.

Models & Performance — Will It Do What You Need?

Each table reads like the curve: the head the pump end on its matching motor adds at shut-off, along its curve and at the rated flow of 475 GPM, out to the end of the published curve. Pick a model whose head at your flow covers the pumping level, the pressure you need at the surface (2.31 ft per psi) and pipe friction.

475S · rated 475 GPM · 7-1/2 to 50 HP · 10 models
Model HP 0 GPM (Shut-off) 131 GPM 326 GPM 475 GPM (Rated) 653 GPM (Max)
475S75-1A 7-1/2 76 69 53 51 6
475S100-1 10 106 93 69 61 23
475S150-2B 15 169 153 119 108 28
475S200-2 20 209 190 148 124 55
475S250-3A 25 — — — 172-173 —
475S300-3 30 309 283 223 186-187 84
475S300-4AB 30 347 318 254 210-212 71
475S400-4 40 410 378 300 245-251 115
475S400-5B 40 469 433 345 284 114
475S500-5 50 509 472 377 313-317 144
475S · rated 475 GPM · 50 to 125 HP · 9 models
Model HP 0 GPM (Shut-off) 131 GPM 326 GPM 475 GPM (Rated) 653 GPM (Max)
475S500-6A 50 — — — 357-363 —
475S600-6 60 604 560 447 375 167
475S600-7 60 712 663 532 449 206
475S750-8 75 816 763 613 513 242
475S1000-9 100 920 857 689 582 272
475S1000-10 100 1013 947 762 643 297
475S1000-11 100 1119 1045 842 711 331
475S1250-12 125 1213 1135 914 771 356
475S1250-13 125 1309 1225 986 831 381

Total head in feet. The shut-off and flow columns are read from the Grundfos 60 Hz curves, digitized from the published vector curves in the Grundfos SP 475S data sheet (60 Hz), at the nearest published point and rounded down. The (Rated) column is the nominal head Grundfos prints for each model at its rated flow, verbatim; where two figures are shown, builds on different motors or voltages differ slightly. No published curve for 475S250-3A, 475S500-6A: rated figure only, full curve on request. 1 ft of head = 0.433 PSI. Full curves are in the product images and on the Data Sheet tab.

Motor by Horsepower

Motor HP 6 in Grundfos motor (230V / 460V) 8 in Grundfos MMS8000 (460V)
7-1/2 HP 96166181 / 96166161 —
10 HP 96166182 / 96166162 —
15 HP 96166184 / 96166164 —
20 HP 96166186 / 96166166 —
25 HP 96166187 / 96166167 —
30 HP 96166188 / 96166168 —
40 HP 96166170 99973360
50 HP 99600226 99973361
60 HP 99673485 99973363
75 HP — 99973364
100 HP — 99973365
125 HP — 99973366

Grundfos US price list, January 2026, the 475S pages. 6 in motors are on our Grundfos MS6000C and MMS6 6 in Submersible Motor listing, 8 in motors on Grundfos MMS8000 and MMS10000 Submersible Motor.

Before You Buy — The Limits That Decide the Fit
Check What to confirm
Motor A Grundfos 6 in or 8 in submersible motor of the horsepower in the selector, with a Grundfos motor flange; ordered separately
Motor control Magnetic starter or drive for the three-phase motor
Well size 8 in casing or larger
Submergence At least 8 ft of water above the pump
Duty point Choose the model from the Grundfos curve at your flow and total head. Send us the pumping level, pipe run and pressure and we will check it against the curve
Materials of Construction
Part Material
Pump Stainless steel, EN 1.4301 (AISI 304)
Impellers Stainless steel, EN 1.4301 (AISI 304)

Source: Grundfos SP data booklet.

For engineering-led sizing and selection support or a factory submittal, email sales@watermainsupply.com or call 1-888.510.4036.