Menu
Product variant with selected options does not exist!
files/grundfos-sp-submersible-pump-end_ce6ea52f-cc86-423e-888a-9ee7171867b5.jpg
08:43 PM
These are the Grundfos SPE replacement pump ends: the stainless steel hydraulic end of an SPE variable speed submersible, with its built-in check valve, sold without the motor. Pump and impellers are AISI 304 stainless steel. The SPE runs on a Grundfos 6 in permanent magnet motor driven by a Grundfos CUE drive; Grundfos rates the motors 4-pole, 3600 RPM, three-phase 460V, operating on 410V.
Use one to rebuild an SPE installation on a sound permanent magnet motor. The complete SPE 10 in pump, with its motor, is listed separately.
Included: the Grundfos SPE replacement pump end with its built-in check valve.
SPE permanent magnet motor required, ordered separately. The pump end mounts on the Grundfos 6 in permanent magnet motor of the horsepower in the selector; the SPE PM replacement motor part number for each build is in the Motor by Horsepower table under Models & Performance.
Drive and filter required, ordered separately. The permanent magnet motor starts and runs only from a drive with IPM motor control, the Grundfos CUE variable frequency drive, with a sine-wave output filter.
Covered for 24 months from the date of installation, but not more than 30 months from the date of manufacture. In Grundfosâs words, products are âwarranted to the original user only to be free of defects in material and workmanshipâ; the full terms are in the installation and operating instructions on the Data Sheet tab. Grundfosâs 5-year system warranty applies when the complete SPE pump, CUE drive and sine-wave filter are bought together.
| Included | Pump end with built-in check valve; PM motor, CUE drive and sine-wave filter ordered separately |
| Rated flow | 625, 800 and 1,100 GPM, by series |
| Motor | Grundfos 6 in permanent magnet motor, 25 to 50 HP; Grundfos motor flange |
| Drive | Grundfos CUE with IPM motor control, plus a sine-wave output filter |
| Discharge | 6 in NPT (female), by series |
| Minimum borehole | 8.5-9.7 in by build (Grundfos Product Center) |
| Liquid temperature | Up to 140°F (60°C) at the pump end; the motor sets the working limit |
| Approvals | cCSAus and CULDWUS (Grundfos Product Center codes) |
| Curve tolerance | ISO 9906 |
Each table reads like the curve: the head the pump end on its matching motor adds at shut-off, along its curve and at the rated flow of 625 GPM, 800 GPM and 1100 GPM, out to the end of the published curve. Pick a model whose head at your flow covers the pumping level, the pressure you need at the surface (2.31 ft per psi) and pipe friction.
| Model | HP | 0 GPM (Shut-off) | 177 GPM | 442 GPM | 625 GPM (Rated) | 883 GPM (Max) |
|---|---|---|---|---|---|---|
| SPE625S250-1 | 25 | 148 | 146 | 121 | 106 | 64 |
| SPE625S500-2 | 50 | 289 | 288 | 248 | 212 | 137 |
| Model | HP | 0 GPM (Shut-off) | 227 GPM | 568 GPM | 800 GPM (Rated) | 1137 GPM (Max) |
|---|---|---|---|---|---|---|
| SPE800S400-1 | 40 | 166 | 162 | 125 | 102 | 65 |
| Model | HP | 0 GPM (Shut-off) | 307 GPM | 766 GPM | 1100 GPM (Rated) | 1533 GPM (Max) |
|---|---|---|---|---|---|---|
| SPE1100S500-1 | 50 | 191 | 181 | 144 | 119 | 57 |
Total head in feet. The shut-off and flow columns are read from the Grundfos 60 Hz curves at 3600 rpm, digitized from the published vector curves in the Grundfos SPE data booklet, at the nearest published point and rounded down. The (Rated) column is the nominal head Grundfos prints for each model at its rated flow, verbatim; where two figures are shown, builds on different motors or voltages differ slightly. 1 ft of head = 0.433 PSI. Full curves are in the product images and on the Data Sheet tab.
Motor by Horsepower
| Motor HP | Models | Grundfos MS6000P PM motor |
|---|---|---|
| 25 HP | SPE625S250-1 | 99843439 |
| 40 HP | SPE800S400-1 | 99843440 |
| 50 HP | SPE625S500-2, SPE1100S500-1 | 99843441 |
Grundfos US price list, January 2026. The SPE PM motor runs only from a drive with IPM motor control and an IPM-ready sine-wave filter; both are sized on the complete-pump listing.
| Motor | A Grundfos 6 in permanent magnet motor of the horsepower in the selector (part numbers in the Motor by Horsepower table under Models & Performance) |
| Drive | A Grundfos CUE drive with IPM motor control and a sine-wave output filter; the motor does not run across the line |
| Power | Three-phase 460V supply to the drive |
| Well size | At least the minimum borehole for the build (Specifications) |
| Duty point | Choose the model from the Grundfos curve at your flow and total head. Send us the pumping level, pipe run and pressure and we will check it against the curve |
| Water temperature | Up to 140°F (60°C) at the pump end; the motor sets the working limit |
| Pump | Stainless steel, EN 1.4301 (AISI 304) |
| Impellers | Stainless steel, EN 1.4301 (AISI 304) |
Source: Grundfos Product Center.
Sign up for our newsletter and be the first to know about coupons and special promotions.
© 2026, Watermainsupply