Grundfos 800S SP 10 in Submersible Pump End

HP - Motor Dia: 20 HP - 6 in Motor
Model - Head: 800S200-1A - 72 ft at 800 GPM

Product variant with selected options does not exist!

Price
$3,445.94
Coupon 5% off applied automatically in your cart. No code needed.
SKU: 202500A1
Weight : 57.0 lb
Loading locations...
Free Shipping $499 or more
Skip the chatbot. Talk to an expert.
1-888.510.4036 ¡ Same-day shipping available
Description
Grundfos ¡ Submersible Pump End
800S SP 10 in Pump End
800 GPM class stainless steel SP pump end, motor not included: 18 builds for 20 to 125 HP motors, on 6 and 8 in motors.
72-479 ft Head at 800 GPM
20-125 HP
6 and 8 in Motor Fit
6 in NPT Discharge
10 in Min. Well
Built-In Check Valve
AISI 304 Stainless Steel
cCSAus
8.3-8.4 in Dia x 25.6-50.1 in L
73.2-134.5 lb Weight
Overview

The Grundfos 800S is the 800 GPM class of the SP 10 in submersible range, sold here as the pump end alone: stainless steel chambers and impellers with a built-in check valve, ready to mount on a submersible motor. Pump and impellers are AISI 304 stainless steel. Use it to rebuild an SP installation on a sound motor, or to build a pump around a motor you already have; the complete 800S pumps with Grundfos motors are listed separately.

Every 800S pump end has a Grundfos motor flange and a 6 in NPT discharge. Match the motor horsepower and diameter in the selector; send us the motor model and we will confirm the fit.

What Ships and What It Needs to Run

Included: the Grundfos 800S SP pump end with its built-in check valve.

Submersible motor required, ordered separately. The pump end mounts on a 6 in or 8 in submersible motor with a Grundfos motor flange, plus the motor’s control: a starter or drive for a three-phase motor. The motor horsepower and diameter for each build are in the Motor by Horsepower table under Models & Performance.

Genuine Grundfos equipment, factory-new in original packaging — sold and supported by Watermain Supply, an independent industrial supplier.
24-Month Grundfos Warranty

Covered for 24 months from the date of installation, but not more than 30 months from the date of manufacture. In Grundfos’s words, products are “warranted to the original user only to be free of defects in material and workmanship”; the full terms are in the installation and operating instructions on the Data Sheet tab.

Specifications
Included Pump end with built-in check valve; motor and its control ordered separately
Rated flow 800 GPM
Motor horsepower 20 to 125 HP
Motor 6 in or 8 in submersible motor, Grundfos motor flange
Discharge 6 in NPT (female)
Minimum well 10 in (Grundfos price list); Product Center gives a minimum borehole of 8.5-8.9 in by build
Liquid temperature Up to 140°F (60°C) at the pump end; the motor sets the working limit
Approvals cCSAus and CULDWUS (Grundfos Product Center codes)
Curve tolerance ISO 9906
Models & Performance — Will It Do What You Need?

Each table reads like the curve: the head the pump end on its matching motor adds at shut-off, along its curve and at the rated flow of 800 GPM, out to the end of the published curve. Pick a model whose head at your flow covers the pumping level, the pressure you need at the surface (2.31 ft per psi) and pipe friction.

800S ¡ rated 800 GPM ¡ 20 to 75 HP ¡ 7 models
Model HP 0 GPM (Shut-off) 219 GPM 548 GPM 800 GPM (Rated) 1095 GPM (Max)
800S200-1A 20 116 104 82 72 18
800S300-1 30 160 155 118 95-96 61
800S400-2AA 40 220 207 170 141-143 43
800S500-2A 50 264 257 206 172-174 89
800S500-2 50 307 299 236 189-192 120
800S600-3AA 60 370 361 296 239-247 117
800S750-3A 75 417 408 331 281 157
800S ¡ rated 800 GPM ¡ 75 to 125 HP ¡ 7 models
Model HP 0 GPM (Shut-off) 219 GPM 548 GPM 800 GPM (Rated) 1095 GPM (Max)
800S750-3 75 460 452 362 293 191
800S1000-4AA 100 520 509 417 354 180
800S1000-4A 100 567 555 451 385 218
800S1000-4 100 610 598 482 390 252
800S1250-5AA 125 668 654 535 454 240
800S1250-5A 125 710 696 566 457 274
800S1250-5 125 754 738 596 479 308

Total head in feet. The shut-off and flow columns are read from the Grundfos 60 Hz curves, digitized from the published vector curves in the Grundfos SP 800S data sheet (60 Hz), at the nearest published point and rounded down. The (Rated) column is the nominal head Grundfos prints for each model at its rated flow, verbatim; where two figures are shown, builds on different motors or voltages differ slightly. 1 ft of head = 0.433 PSI. Full curves are in the product images and on the Data Sheet tab.

Motor by Horsepower

Motor HP Motor Models
20 HP 6 in 800S200-1A
30 HP 6 in 800S300-1
40 HP 6 in or 8 in 800S400-2AA
50 HP 6 in or 8 in 800S500-2A, 800S500-2
60 HP 6 in or 8 in 800S600-3AA
75 HP 8 in 800S750-3A, 800S750-3
100 HP 8 in 800S1000-4AA, 800S1000-4A, 800S1000-4
125 HP 8 in 800S1250-5AA, 800S1250-5A, 800S1250-5

Grundfos US price list, January 2026. Grundfos motors for these builds are on our Grundfos MS 6 in motor and Grundfos MMS 8 in and 10 in motor listings. Add the motor's control: a control box for a single-phase 3-wire motor, a starter or drive for a three-phase motor.

Before You Buy — The Limits That Decide the Fit
Motor A 6 in or 8 in submersible motor of the horsepower in the selector, with a Grundfos motor flange; ordered separately
Motor control Starter or drive for the three-phase motor
Well size Casing ID of at least 10 in; check the pump-end diameter in the size badge against your casing
Duty point Choose the model from the Grundfos curve at your flow and total head. Send us the pumping level, pipe run and pressure and we will check it against the curve
Water temperature Up to 140°F (60°C) at the pump end; the motor sets the working limit
Materials of Construction
Pump Stainless steel, EN 1.4301 (AISI 304)
Impellers Stainless steel, EN 1.4301 (AISI 304)

Source: Grundfos Product Center.

For engineering-led sizing and selection support or a factory submittal, email sales@watermainsupply.com or call 1-888.510.4036.
© Watermain Supply — A division of E4 Industrial LLC
Data Sheet
Videos

You May Also Like