Grundfos 625S SP 10 in Submersible Pump End

HP - Motor Dia: 15 HP - 6 in Motor
Model - Head: 625S150-1A - 76 ft at 625 GPM

Product variant with selected options does not exist!

Price
$2,865.49
Coupon 5% off applied automatically in your cart. No code needed.
SKU: 17BG00A1
Weight : 82.0 lb
Loading locations...
Free Shipping $499 or more
Skip the chatbot. Talk to an expert.
1-888.510.4036 ¡ Same-day shipping available
Description
Grundfos ¡ Submersible Pump End
625S SP 10 in Pump End
625 GPM class stainless steel SP pump end, motor not included: 24 builds for 15 to 150 HP motors, on 6 and 8 in motors.
76-696 ft Head at 625 GPM
15-150 HP
6 and 8 in Motor Fit
6 in NPT Discharge
10 in Min. Well
Built-In Check Valve
AISI 304 Stainless Steel
cCSAus
8.3-8.4 in Dia x 25.6-62.4 in L
73.2-160.9 lb Weight
Overview

The Grundfos 625S is the 625 GPM class of the SP 10 in submersible range, sold here as the pump end alone: stainless steel chambers and impellers with a built-in check valve, ready to mount on a submersible motor. Pump and impellers are AISI 304 stainless steel. Use it to rebuild an SP installation on a sound motor, or to build a pump around a motor you already have; the complete 625S pumps with Grundfos motors are listed separately.

Every 625S pump end has a Grundfos motor flange and a 6 in NPT discharge. Match the motor horsepower and diameter in the selector; send us the motor model and we will confirm the fit.

What Ships and What It Needs to Run

Included: the Grundfos 625S SP pump end with its built-in check valve.

Submersible motor required, ordered separately. The pump end mounts on a 6 in or 8 in submersible motor with a Grundfos motor flange, plus the motor’s control: a starter or drive for a three-phase motor. The motor horsepower and diameter for each build are in the Motor by Horsepower table under Models & Performance.

Genuine Grundfos equipment, factory-new in original packaging — sold and supported by Watermain Supply, an independent industrial supplier.
24-Month Grundfos Warranty

Covered for 24 months from the date of installation, but not more than 30 months from the date of manufacture. In Grundfos’s words, products are “warranted to the original user only to be free of defects in material and workmanship”; the full terms are in the installation and operating instructions on the Data Sheet tab.

Specifications
Included Pump end with built-in check valve; motor and its control ordered separately
Rated flow 625 GPM
Motor horsepower 15 to 150 HP
Motor 6 in or 8 in submersible motor, Grundfos motor flange
Discharge 6 in NPT (female)
Minimum well 10 in (Grundfos price list); Product Center gives a minimum borehole of 8.5-8.9 in by build
Liquid temperature Up to 140°F (60°C) at the pump end; the motor sets the working limit
Approvals cCSAus and CULDWUS (Grundfos Product Center codes)
Curve tolerance ISO 9906
Models & Performance — Will It Do What You Need?

Each table reads like the curve: the head the pump end on its matching motor adds at shut-off, along its curve and at the rated flow of 625 GPM, out to the end of the published curve. Pick a model whose head at your flow covers the pumping level, the pressure you need at the surface (2.31 ft per psi) and pipe friction.

625S ¡ rated 625 GPM ¡ 15 to 75 HP ¡ 10 models
Model HP 0 GPM (Shut-off) 172 GPM 429 GPM 625 GPM (Rated) 858 GPM (Max)
625S150-1A 15 100 97 82 76 24
625S250-1 25 145 140 117 101 61
625S300-2AA 30 191 191 167 143-144 48
625S400-2A 40 236 234 201 171 84
625S400-2 40 280 276 235 203-205 122
625S500-3AA 50 326 327 284 240-243 107
625S600-3A 60 370 367 317 267-278 144
625S600-3 60 417 415 359 299-301 194
625S750-4AA 75 466 470 412 350 182
625S750-4A 75 509 512 446 384 221
625S ¡ rated 625 GPM ¡ 100 to 150 HP ¡ 10 models
Model HP 0 GPM (Shut-off) 172 GPM 429 GPM 625 GPM (Rated) 858 GPM (Max)
625S1000-4 100 555 555 482 402 263
625S1000-5AA 100 603 608 533 460 249
625S1000-5A 100 647 650 568 490 288
625S1000-5 100 691 691 602 500 327
625S1250-6A 125 — — — — —
625S1250-6AA 125 736 741 649 557 307
625S1250-6 125 823 823 716 590 384
625S1250-7AA 125 868 872 762 655 363
625S1500-7 150 960 961 838 690 451
625S1500-7A 150 911 913 795 696 400

Total head in feet. The shut-off and flow columns are read from the Grundfos 60 Hz curves, digitized from the published vector curves in the Grundfos SP 625S data sheet (60 Hz), at the nearest published point and rounded down. The (Rated) column is the nominal head Grundfos prints for each model at its rated flow, verbatim; where two figures are shown, builds on different motors or voltages differ slightly. No published curve for 625S1250-6A: rated figure only, full curve on request. 1 ft of head = 0.433 PSI. Full curves are in the product images and on the Data Sheet tab.

Motor by Horsepower

Motor HP Motor Models
15 HP 6 in 625S150-1A
25 HP 6 in 625S250-1
30 HP 6 in 625S300-2AA
40 HP 6 in or 8 in 625S400-2A, 625S400-2
50 HP 6 in or 8 in 625S500-3AA
60 HP 6 in or 8 in 625S600-3A, 625S600-3
75 HP 8 in 625S750-4AA, 625S750-4A
100 HP 8 in 625S1000-4, 625S1000-5AA, 625S1000-5A, 625S1000-5
125 HP 8 in 625S1250-6A, 625S1250-6AA, 625S1250-6, 625S1250-7AA
150 HP 8 in 625S1500-7, 625S1500-7A

Grundfos US price list, January 2026. Grundfos motors for these builds are on our Grundfos MS 6 in motor and Grundfos MMS 8 in and 10 in motor listings. Add the motor's control: a control box for a single-phase 3-wire motor, a starter or drive for a three-phase motor.

Before You Buy — The Limits That Decide the Fit
Motor A 6 in or 8 in submersible motor of the horsepower in the selector, with a Grundfos motor flange; ordered separately
Motor control Starter or drive for the three-phase motor
Well size Casing ID of at least 10 in; check the pump-end diameter in the size badge against your casing
Duty point Choose the model from the Grundfos curve at your flow and total head. Send us the pumping level, pipe run and pressure and we will check it against the curve
Water temperature Up to 140°F (60°C) at the pump end; the motor sets the working limit
Materials of Construction
Pump Stainless steel, EN 1.4301 (AISI 304)
Impellers Stainless steel, EN 1.4301 (AISI 304)

Source: Grundfos Product Center.

For engineering-led sizing and selection support or a factory submittal, email sales@watermainsupply.com or call 1-888.510.4036.