Menu
Product variant with selected options does not exist!
files/grundfos-sp-4-in-pump-end_25d0bfbe-8dd5-4d28-a09f-3f0e8fed6113.jpg
08:12 PM
The Grundfos 300S is the 300 GPM class of the SP 6 in submersible range, sold here as the pump end alone: stainless steel chambers and impellers with a built-in check valve, ready to mount on a submersible motor. Pump and impellers are AISI 304 stainless steel. Use it to rebuild an SP installation on a sound motor, or to build a pump around a motor you already have; the complete 300S pumps with Grundfos motors are listed separately.
Every 300S pump end has a Grundfos motor flange. Match the motor horsepower and diameter in the selector; send us the motor model and we will confirm the fit.
Included: the Grundfos 300S SP pump end with its built-in check valve.
Submersible motor required, ordered separately. The pump end mounts on a 4 in, 6 in or 8 in submersible motor with a Grundfos motor flange, plus the motor’s control: a control box for a single-phase 3-wire motor, or a starter or drive for a three-phase motor. The motor horsepower and diameter for each build are in the Motor by Horsepower table under Models & Performance.
24 months from date of installation, but not more than 30 months from date of manufacture. In Grundfos's words, products are “warranted to the original user only to be free of defects in material and workmanship”; the full terms are in the installation and operating instructions on the Data Sheet tab.
| Specification | Value |
|---|---|
| Rated flow | 300 GPM |
| Motor horsepower | 3 to 75 HP |
| Motor | 4 in, 6 in or 8 in submersible motor, Grundfos motor flange |
| Discharge | 3 in and 4 in NPT |
| Minimum well | 6 / 8 in (6 in; 8 in for the sleeve (DS) builds) |
| Check valve | Built in |
| Liquid temperature | Up to 140°F (60°C) at the pump end; the motor sets the working limit |
| Approvals | cCSAus and CULDWUS (Grundfos Product Center codes) |
| Curve tolerance | ISO 9906 |
| Included | Pump end only; motor and its control ordered separately |
Each table reads like the curve: the head the pump end on its matching motor adds at shut-off, along its curve and at the rated flow of 300 GPM, out to the end of the published curve. Pick a model whose head at your flow covers the pumping level, the pressure you need at the surface (2.31 ft per psi) and pipe friction.
| Model | HP | 0 GPM (Shut-off) | 75 GPM | 187 GPM | 300 GPM (Rated) | 374 GPM |
|---|---|---|---|---|---|---|
| 300S30-1B | 3 | 48 | 43 | 31 | 29-30 | 2 |
| 300S50-1 | 5 | 63 | 62 | 46 | 38 | 19 |
| 300S50-2BB | 5 | 90 | 83 | 66 | 57 | 15 |
| 300S75-2 | 7-1/2 | 130 | 126 | 98 | 77-78 | 48 |
| 300S100-3A | 10 | 177 | 171 | 135 | 107 | 61 |
| 300S150-3 | 15 | 200 | 193 | 152 | 119 | 77 |
| 300S150-4AA | 15 | 224 | 217 | 173 | 138-139 | 77 |
| 300S150-4 | 15 | 267 | 257 | 205 | 157-158 | 105 |
| 300S200-5AA | 20 | 295 | 286 | 232 | 179-180 | 108 |
| Model | HP | 0 GPM (Shut-off) | 75 GPM | 187 GPM | 300 GPM (Rated) | 374 GPM |
|---|---|---|---|---|---|---|
| 300S200-5 | 20 | 334 | 321 | 257 | 200-201 | 134 |
| 300S200-6B | 20 | 385 | 372 | 302 | 222-224 | 156 |
| 300S250-6 | 25 | 410 | 393 | 317 | 243-244 | 170 |
| 300S250-7AA | 25 | — | — | — | 260-262 | — |
| 300S300-7 | 30 | 473 | 455 | 368 | 283-285 | 198 |
| 300S300-8 | 30 | 540 | 519 | 420 | 321-324 | 223 |
| 300S300-9B | 30 | 580 | 556 | 451 | 343-346 | 232 |
| 300S400-9 | 40 | 604 | 579 | 468 | 370 | 249 |
| 300S400-10 | 40 | 680 | 653 | 531 | 409 | 287 |
| Model | HP | 0 GPM (Shut-off) | 75 GPM | 187 GPM | 300 GPM (Rated) | 374 GPM |
|---|---|---|---|---|---|---|
| 300S400-11 | 40 | 747 | 717 | 582 | 442 | 315 |
| 300S500-12 | 50 | 820 | 790 | 644 | 491 | 349 |
| 300S500-13 | 50 | 887 | 853 | 694 | 529 | 377 |
| 300S600-14 | 60 | 952 | 914 | 745 | 594 | 405 |
| 300S600-15 | 60 | 1040 | 1000 | 819 | 606-629 | 454 |
| 300S750-16 | 75 | 1105 | 1063 | 872 | 678 | 483 |
| 300S750-17 | 75 | 1171 | 1127 | 924 | 719 | 513 |
| 300S750-18 | 75 | 1252 | 1206 | 989 | 760 | 549 |
Total head in feet. The shut-off and flow columns are read from the Grundfos 60 Hz curves, digitized from the published vector curves in the Grundfos SP 300S data sheet (60 Hz), at the nearest published point and rounded down. The (Rated) column is the nominal head Grundfos prints for each model at its rated flow, verbatim; where two figures are shown, builds on different motors or voltages differ slightly. 300S: curves end at 374 GPM to 412 GPM; the last column is the last flow every 300S curve reaches. No published curve for 300S250-7AA: rated figure only, full curve on request. 1 ft of head = 0.433 PSI. Full curves are in the product images and on the Data Sheet tab.
Motor by Horsepower
| Motor HP | Motor | Models |
|---|---|---|
| 3 HP | 4 in | 300S30-1B |
| 5 HP | 4 in | 300S50-1, 300S50-2BB |
| 7-1/2 HP | 4 in or 6 in | 300S75-2 |
| 10 HP | 4 in or 6 in | 300S100-3A |
| 15 HP | 6 in | 300S150-3, 300S150-4AA, 300S150-4 |
| 20 HP | 6 in | 300S200-5AA, 300S200-5, 300S200-6B |
| 25 HP | 6 in | 300S250-6, 300S250-7AA |
| 30 HP | 6 in | 300S300-7, 300S300-8, 300S300-9B |
| 40 HP | 6 in | 300S400-9, 300S400-10, 300S400-11 |
| 50 HP | 6 in | 300S500-12, 300S500-13 |
| 60 HP | 6 in or 8 in | 300S600-14, 300S600-15 |
| 75 HP | 8 in | 300S750-16, 300S750-17, 300S750-18 |
Grundfos US price list, January 2026. Grundfos motors for these builds are on our Grundfos MS 4 in motor, Grundfos MS 6 in motor and Grundfos MMS 8 in and 10 in motor listings. Add the motor's control: a control box for a single-phase 3-wire motor, a starter or drive for a three-phase motor.
| Check | What to confirm |
|---|---|
| Motor | A 4 in, 6 in or 8 in submersible motor of the horsepower in the selector, with a Grundfos motor flange; ordered separately |
| Motor control | Control box for a single-phase 3-wire motor; starter or drive for a three-phase motor |
| Well size | Casing ID at least 6 in; 8 in for the sleeve (DS) builds |
| Duty point | Choose the model from the Grundfos curve at your flow and total head. Send us the pumping level, pipe run and pressure and we will check it against the curve |
| Part | Material |
|---|---|
| Pump | Stainless steel, EN 1.4301 (AISI 304) |
| Impellers | Stainless steel, EN 1.4301 (AISI 304) |
Source: Grundfos Product Center.
Sign up for our newsletter and be the first to know about coupons and special promotions.
© 2026, Watermainsupply