Grundfos 230S and 240S SP 6 in Submersible Pump End

HP - Motor Dia: 2 HP - 4 in Motor
Model - Head: 230S20-1B at 230 GPM

Product variant with selected options does not exist!

Price
$2,247.83
Coupon 5% off applied automatically in your cart. No code needed.
SKU: 15B700C1
Weight : 16.0 lb
Loading locations...
Free Shipping $499 or more
Skip the chatbot. Talk to an expert.
1-888.510.4036 · Same-day shipping available
Description
Grundfos · Submersible Pump End
230S and 240S SP 6 in Pump End
230 and 240 GPM class stainless steel SP pump end, motor not included: 68 builds for 2 to 75 HP motors, on 4, 6 and 8 in motors.
230 and 240 GPM Rated Flow
2-75 HP
20.8-757.1 ft Nominal Head (240S)
3 in and 4 in NPT Discharge
4, 6 and 8 in Motor Fit
Grundfos Motor Flange
Built-In Check Valve
AISI 304 Stainless Steel
cCSAus
14.6-196.2 lb Weight
Overview

The Grundfos 230S and 240S are the 230 and 240 GPM class of the SP 6 in submersible range, sold here as the pump end alone: stainless steel chambers and impellers with a built-in check valve, ready to mount on a submersible motor. Pump and impellers are AISI 304 stainless steel. Use it to rebuild an SP installation on a sound motor, or to build a pump around a motor you already have; the complete 230S and 240S pumps with Grundfos motors are listed separately.

Every 230S and 240S pump end has a Grundfos motor flange. Match the motor horsepower and diameter in the selector; send us the motor model and we will confirm the fit.

What Ships and What It Needs to Run

Included: the Grundfos 230S or 240S SP pump end with its built-in check valve; sleeve builds come built into a stainless steel sleeve with an NPT male discharge.

Submersible motor required, ordered separately. The pump end mounts on a 4 in, 6 in or 8 in submersible motor with a Grundfos motor flange, plus the motor’s control: a control box for a single-phase 3-wire motor, or a starter or drive for a three-phase motor. The motor horsepower and diameter for each build are in the Motor by Horsepower table under Models & Performance.

Genuine Grundfos equipment, factory-new in original packaging — sold and supported by Watermain Supply, an independent industrial supplier.
Warranty

24 months from date of installation, but not more than 30 months from date of manufacture. In Grundfos's words, products are “warranted to the original user only to be free of defects in material and workmanship”; the full terms are in the installation and operating instructions on the Data Sheet tab.

Specifications
Specification Value
Rated flow 230 and 240 GPM
Motor horsepower 2 to 75 HP
Motor 4 in, 6 in or 8 in submersible motor, Grundfos motor flange
Discharge 3 in and 4 in NPT; male on sleeve builds
Minimum well 6 / 8 in (6 in; 8 in for the sleeve (DS) builds)
Check valve Built in
Liquid temperature Up to 140°F (60°C) at the pump end; the motor sets the working limit
Approvals cCSAus; CULDWUS on the non-sleeve builds (Grundfos Product Center codes)
Curve tolerance ISO 9906
Included Pump end only; motor and its control ordered separately
Models & Performance — Will It Do What You Need?

Each table reads like the curve: the head the pump end on its matching motor adds at shut-off, along its curve and at the rated flow of 230 GPM and 240 GPM, out to the end of the published curve. Pick a model whose head at your flow covers the pumping level, the pressure you need at the surface (2.31 ft per psi) and pipe friction.

230S · rated 230 GPM · 2 to 15 HP · 10 models
Model HP 230 GPM (Rated)
230S20-1B 2 —
230S30-1A 3 —
230S50-1 5 —
230S50-2AB 5 —
230S75-2 7-1/2 —
230S75-3BB 7-1/2 —
230S100-3 10 —
230S100-4BC 10 —
230S150-4 15 —
230S150-5B 15 —
230S · rated 230 GPM · 20 to 40 HP · 10 models
Model HP 230 GPM (Rated)
230S200-5 20 —
230S200-6 20 —
230S200-7C 20 —
230S250-7 25 —
230S250-8 25 —
230S250-8B 25 —
230S250-9BB 25 —
230S300-9 30 —
230S400-10 40 —
230S400-11 40 —
230S · rated 230 GPM · 40 to 75 HP · 10 models
Model HP 230 GPM (Rated)
230S400-12 40 —
230S400-13 40 —
230S500-14 50 —
230S500-15 50 —
230S500-16 50 —
230S600-17 60 —
230S600-18 60 —
230S600-19 60 —
230S750-20 75 —
230S750-22 75 —
240S · rated 240 GPM · 2 to 10 HP · 10 models
Model HP 0 GPM (Shut-off) 65 GPM 162 GPM 240 GPM (Rated) 323 GPM (Max)
240S20-1A - 20.8 ft 2 — — — — —
240S30-1 - 31.2-31.7 ft 3 — — — — —
240S50-2B - 60.2-60.7 ft 5 — — — — —
240S75-2 - 71.4-72.5 ft 7-1/2 — — — — —
240S75-2 - 72.9-73.3 ft 7-1/2 — — — — —
240S75-3AB - 88.4-88.9 ft 7-1/2 — — — — —
240S100-3 - 112.2 ft 10 — — — — —
240S100-3 - 112.5-113.3 ft 10 — — — — —
240S100-4AB - 128.6 ft 10 — — — — —
240S100-4AB - 127.5-128.6 ft 10 — — — — —
240S · rated 240 GPM · 15 to 40 HP · 10 models
Model HP 0 GPM (Shut-off) 65 GPM 162 GPM 240 GPM (Rated) 323 GPM (Max)
240S150-4 - 154.6-155 ft 15 — — — — —
240S150-5 - 196.5-197.5 ft 15 — — — — —
240S200-6 - 234.2-235.8 ft 20 — — — — —
240S250-7 - 276.8-278.1 ft 25 — — — — —
240S250-8 - 314.4-316.8 ft 25 — — — — —
240S250-9 25 — — — — —
240S300-10 - 392.6-396.4 ft 30 — — — — —
240S400-11 40 626 608 536 440 267
240S400-12 - 482.8 ft 40 — — — — —
240S400-13 - 517.5 ft 40 — — — — —
240S · rated 240 GPM · 50 to 75 HP · 10 models
Model HP 0 GPM (Shut-off) 65 GPM 162 GPM 240 GPM (Rated) 323 GPM (Max)
240S500-14 50 — — — — —
240S500-15 - 601.7 ft 50 — — — — —
240S500-16 - 638.7 ft 50 — — — — —
240S500-17 - 675.7 ft 50 — — — — —
240S500-17 - 674.9 ft 50 — — — — —
240S500-18 - 711.8 ft 50 — — — — —
240S600-19 - 757.1 ft 60 — — — — —
240S600-19 - 752.4 ft 60 — — — — —
240S600-20 60 — — — — —
240S750-22 75 — — — — —

Total head in feet. The shut-off and flow columns are read from the Grundfos 60 Hz curves, digitized from the published vector curves in the Grundfos SP 240S data sheet (60 Hz), at the nearest published point and rounded down. The (Rated) column is the nominal head Grundfos prints for each model at its rated flow, verbatim; where two figures are shown, builds on different motors or voltages differ slightly. No published curve for 230S20-1B, 230S30-1A, 230S50-1, 230S50-2AB, 230S75-2, 230S75-3BB, 230S100-3, 230S100-4BC, 230S150-4, 230S150-5B, 230S200-5, 230S200-6, 230S200-7C, 230S250-7, 230S250-8, 230S250-8B, 230S250-9BB, 230S300-9, 230S400-10, 230S400-11, 230S400-12, 230S400-13, 230S500-14, 230S500-15, 230S500-16, 230S600-17, 230S600-18, 230S600-19, 230S750-20, 230S750-22, 240S20-1A - 20.8 ft, 240S30-1 - 31.2-31.7 ft, 240S50-2B - 60.2-60.7 ft, 240S75-2 - 71.4-72.5 ft, 240S75-2 - 72.9-73.3 ft, 240S75-3AB - 88.4-88.9 ft, 240S100-3 - 112.2 ft, 240S100-3 - 112.5-113.3 ft, 240S100-4AB - 128.6 ft, 240S100-4AB - 127.5-128.6 ft, 240S150-4 - 154.6-155 ft, 240S150-5 - 196.5-197.5 ft, 240S200-6 - 234.2-235.8 ft, 240S250-7 - 276.8-278.1 ft, 240S250-8 - 314.4-316.8 ft, 240S250-9, 240S300-10 - 392.6-396.4 ft, 240S400-12 - 482.8 ft, 240S400-13 - 517.5 ft, 240S500-14, 240S500-15 - 601.7 ft, 240S500-16 - 638.7 ft, 240S500-17 - 675.7 ft, 240S500-17 - 674.9 ft, 240S500-18 - 711.8 ft, 240S600-19 - 757.1 ft, 240S600-19 - 752.4 ft, 240S600-20, 240S750-22: rated figure only, full curve on request. 1 ft of head = 0.433 PSI. Full curves are in the product images and on the Data Sheet tab.

Motor by Horsepower

Motor HP Motor Models
2 HP 4 in 230S20-1B, 240S20-1A
3 HP 4 in 230S30-1A, 240S30-1
5 HP 4 in 230S50-1, 230S50-2AB, 240S50-2B
7-1/2 HP 4 in or 6 in 230S75-2, 230S75-3BB, 240S75-2, 240S75-3AB
10 HP 4 in or 6 in 230S100-3, 230S100-4BC, 240S100-3, 240S100-4AB
15 HP 6 in 230S150-4, 230S150-5B, 240S150-4, 240S150-5
20 HP 6 in 230S200-5, 230S200-6, 230S200-7C, 240S200-6
25 HP 6 in 230S250-7, 230S250-8, 230S250-8B, 230S250-9BB, 240S250-9, 240S250-7, 240S250-8
30 HP 6 in 230S300-9, 240S300-10
40 HP 6 in 230S400-10, 230S400-11, 230S400-12, 230S400-13, 240S400-11, 240S400-12, 240S400-13
50 HP 6 in or 8 in 230S500-14, 230S500-15, 230S500-16, 240S500-14, 240S500-15, 240S500-16, 240S500-17, 240S500-18
60 HP 6 in or 8 in 230S600-17, 230S600-18, 230S600-19, 240S600-19, 240S600-20
75 HP 8 in 230S750-20, 230S750-22, 240S750-22

Grundfos US price list, January 2026. Grundfos motors for these builds are on our Grundfos MS 4 in motor, Grundfos MS 6 in motor and Grundfos MMS 8 in and 10 in motor listings. Add the motor's control: a control box for a single-phase 3-wire motor, a starter or drive for a three-phase motor.

Before You Buy — The Limits That Decide the Fit
Check What to confirm
Motor A 4 in, 6 in or 8 in submersible motor of the horsepower in the selector, with a Grundfos motor flange; ordered separately
Motor control Control box for a single-phase 3-wire motor; starter or drive for a three-phase motor
Well size Casing ID at least 6 in; 8 in for the sleeve (DS) builds; sleeve builds need an 8 in well
Duty point Choose the model from the Grundfos curve at your flow and total head. Send us the pumping level, pipe run and pressure and we will check it against the curve
Materials of Construction
Part Material
Pump Stainless steel, EN 1.4301 (AISI 304)
Impellers Stainless steel, EN 1.4301 (AISI 304)

Source: Grundfos Product Center.

For engineering-led sizing and selection support or a factory submittal, email sales@watermainsupply.com or call 1-888.510.4036.