Grundfos 1100S SP 10 in Submersible Pump End

HP - Motor Dia: 30 HP - 6 in Motor
Model - Head: 1100S300-1A - 77-89 ft at 1100 GPM

Product variant with selected options does not exist!

Price
$4,986.42
Coupon 5% off applied automatically in your cart. No code needed.
SKU: 18BG00A1
Weight : 96.0 lb
Loading locations...
Free Shipping $499 or more
Skip the chatbot. Talk to an expert.
1-888.510.4036 ¡ Same-day shipping available
Description
Grundfos ¡ Submersible Pump End
1100S SP 10 in Pump End
1,100 GPM class stainless steel SP pump end, motor not included: 22 builds for 30 to 250 HP motors, on 6, 8 and 10 in motors.
77-703 ft Head at 1,100 GPM
30-250 HP
6, 8 and 10 in Motor Fit
6 in NPT Discharge
10 in Min. Well
Built-In Check Valve
AISI 304 Stainless Steel
cCSAus
9.3-9.8 in Dia x 31.1-77.6 in L
86.0-233.7 lb Weight
Overview

The Grundfos 1100S is the 1,100 GPM class of the SP 10 in submersible range, sold here as the pump end alone: stainless steel chambers and impellers with a built-in check valve, ready to mount on a submersible motor. Pump and impellers are AISI 304 stainless steel. Use it to rebuild an SP installation on a sound motor, or to build a pump around a motor you already have; the complete 1100S pumps with Grundfos motors are listed separately.

Every 1100S pump end has a Grundfos motor flange and a 6 in NPT discharge. Match the motor horsepower and diameter in the selector; send us the motor model and we will confirm the fit.

What Ships and What It Needs to Run

Included: the Grundfos 1100S SP pump end with its built-in check valve.

Submersible motor required, ordered separately. The pump end mounts on a 6 in, 8 in or 10 in submersible motor with a Grundfos motor flange, plus the motor’s control: a starter or drive for a three-phase motor. The motor horsepower and diameter for each build are in the Motor by Horsepower table under Models & Performance. The 10 in motor builds attach to a Grundfos motor only, per the Grundfos price list; for another motor, ask us and we will consult the factory.

Genuine Grundfos equipment, factory-new in original packaging — sold and supported by Watermain Supply, an independent industrial supplier.
24-Month Grundfos Warranty

Covered for 24 months from the date of installation, but not more than 30 months from the date of manufacture. In Grundfos’s words, products are “warranted to the original user only to be free of defects in material and workmanship”; the full terms are in the installation and operating instructions on the Data Sheet tab.

Specifications
Included Pump end with built-in check valve; motor and its control ordered separately
Rated flow 1,100 GPM
Motor horsepower 30 to 250 HP
Motor 6 in, 8 in or 10 in submersible motor, Grundfos motor flange
Discharge 6 in NPT (female)
Minimum well 10 in (Grundfos price list); Product Center gives a minimum borehole of 9.7-10.1 in by build
Liquid temperature Up to 140°F (60°C) at the pump end; the motor sets the working limit
Approvals cCSAus and CULDWUS (Grundfos Product Center codes)
Curve tolerance ISO 9906
Models & Performance — Will It Do What You Need?

Each table reads like the curve: the head the pump end on its matching motor adds at shut-off, along its curve and at the rated flow of 1100 GPM, out to the end of the published curve. Pick a model whose head at your flow covers the pumping level, the pressure you need at the surface (2.31 ft per psi) and pipe friction.

1100S ¡ rated 1100 GPM ¡ 30 to 150 HP ¡ 9 models
Model HP 0 GPM (Shut-off) 295 GPM 736 GPM 1100 GPM (Rated) 1473 GPM (Max)
1100S300-1A 30 126 122 100 77-89 14
1100S400-1 40 183 172 136 109-110 54
1100S600-2AA 60 260 254 218 178-180 58
1100S750-2A 75 318 305 256 217 99
1100S1000-2 100 374 356 289 230 141
1100S1000-3AA 100 450 434 371 314 135
1100S1250-3A 125 503 484 403 319 175
1100S1250-3 125 557 533 434 340 215
1100S1500-4AA 150 634 612 517 411 212
1100S ¡ rated 1100 GPM ¡ 150 to 250 HP ¡ 8 models
Model HP 0 GPM (Shut-off) 295 GPM 736 GPM 1100 GPM (Rated) 1473 GPM (Max)
1100S1500-4A 150 687 661 548 431 250
1100S1500-4 150 739 710 579 450 290
1100S1750-5AA 175 825 798 673 524 299
1100S2000-5 200 939 907 745 577 390
1100S2000-5A 200 — — — — —
1100S2500-6AA 250 — — — 658 —
1100S2500-6A 250 — — — 673 —
1100S2500-6 250 — — — 703 —

Total head in feet. The shut-off and flow columns are read from the Grundfos 60 Hz curves, digitized from the published vector curves in the Grundfos SP 1100S data sheet (60 Hz), at the nearest published point and rounded down. The (Rated) column is the nominal head Grundfos prints for each model at its rated flow, verbatim; where two figures are shown, builds on different motors or voltages differ slightly. No published curve for 1100S2000-5A, 1100S2500-6AA, 1100S2500-6A, 1100S2500-6: rated figure only, full curve on request. 1 ft of head = 0.433 PSI. Full curves are in the product images and on the Data Sheet tab.

Motor by Horsepower

Motor HP Motor Models
30 HP 6 in 1100S300-1A
40 HP 6 in or 8 in 1100S400-1
60 HP 6 in or 8 in 1100S600-2AA
75 HP 8 in 1100S750-2A
100 HP 8 in 1100S1000-2, 1100S1000-3AA
125 HP 8 in 1100S1250-3A, 1100S1250-3
150 HP 8 in 1100S1500-4AA, 1100S1500-4A, 1100S1500-4
175 HP 8 in or 10 in 1100S1750-5AA
200 HP 8 in or 10 in 1100S2000-5, 1100S2000-5A
250 HP 10 in 1100S2500-6AA, 1100S2500-6A, 1100S2500-6

Grundfos US price list, January 2026. Grundfos motors for these builds are on our Grundfos MS 6 in motor and Grundfos MMS 8 in and 10 in motor listings. Add the motor's control: a control box for a single-phase 3-wire motor, a starter or drive for a three-phase motor.

Before You Buy — The Limits That Decide the Fit
Motor A 6 in, 8 in or 10 in submersible motor of the horsepower in the selector, with a Grundfos motor flange; ordered separately; 10 in motor builds attach to a Grundfos motor only
Motor control Starter or drive for the three-phase motor
Well size Casing ID of at least 10 in; check the pump-end diameter in the size badge against your casing
Duty point Choose the model from the Grundfos curve at your flow and total head. Send us the pumping level, pipe run and pressure and we will check it against the curve
Water temperature Up to 140°F (60°C) at the pump end; the motor sets the working limit
Materials of Construction
Pump Stainless steel, EN 1.4301 (AISI 304)
Impellers Stainless steel, EN 1.4301 (AISI 304)

Source: Grundfos Product Center.

For engineering-led sizing and selection support or a factory submittal, email sales@watermainsupply.com or call 1-888.510.4036.