Menu
Product variant with selected options does not exist!
files/Zoeller_6267-Commercial-Sewage-Pump_6bd3d4a7-a180-4ab4-b5fc-f2efc81ef1e7.jpg
08:44 PM
The Zoeller 6267 is a commercial duty submersible sewage pump: a 1/2 HP, 1750 RPM oil-filled motor with sleeve bearings, cast iron construction, and a non-clogging vortex impeller (engineered plastic with metal insert on single phase, cast iron on three phase) passing 2 in spherical solids through a 2 in NPT discharge.
Included: the Zoeller pump built to the part number selected, with the cord length and options in that build.
Needs to run: a control panel matched to the pump voltage, phase and full load amps; three phase builds and builds with thermal or moisture sensors need panel circuits for those sensors. Zoeller Pivot panels and our team can match one to the pump.
| Horsepower | 1/2 HP, 1750 RPM |
| Max Flow | 115 GPM at 5 ft |
| Max Head | 20.5 ft |
| Solids | 2 in spherical |
| Discharge | 2 in NPT vertical |
| Seal | Silicon carbide/carbon |
| Cord | 15 ft standard |
| Weight | 47.5 lb |
| Full Load Amps | 115V 9.4 · 200V 1Ph 6.2 · 230V 1Ph 4.7 · 200V 3Ph 3.6 · 230V 3Ph 3.3 · 460V 2.0 |
| Max Water Temperature | 130 °F |
From Zoeller Engineered Products Tech Data ZM3067.
Find your total dynamic head (vertical lift plus pipe friction) and read across to the flow you need. Each row is a standard impeller; the build you select may carry a trimmed impeller sized to a design point.
Total head in feet at each flow
| Model | 0 GPM (Shut-off) | 25 GPM | 60 GPM | 85 GPM | 115 GPM |
|---|---|---|---|---|---|
| 6267 · 1/2 HP | 20 | 17 | 13 | 10 | 5 |
Read from Zoeller’s vector performance curve (Zoeller curve 013225 (Tech Data ZM3067)) and rounded down to the whole foot. Curve ends: 6267 · 1/2 HP at 115 GPM. Trimmed impellers and the full curves are on the curve images and the Data Sheet tab; a trimmed build delivers less head than the standard impeller shown.
Pick the voltage, then the build: each build names the cord length, discharge, seals, sensors and impeller trim that Zoeller assembles for that part number.
| Voltage and Phase | Match the site supply exactly; three phase pumps need a three phase panel and starter. |
| Duty Point | Check the flow and total dynamic head against the performance curve (images and Data Sheet tab). Trimmed impeller builds are cut to a specific duty point. |
| Sensors | Thermal and moisture sensors only protect the pump when the control panel has circuits wired for them. |
| Explosion Proof | Explosion proof builds are for classified hazardous locations; confirm the area classification with the engineer of record. |
| Lead Time | Made to order: 4-6 weeks after receipt of order. Plan the install date around it. |
Product videos are being added to this listing. For a walkthrough in the meantime, email sales@watermainsupply.com.
Sign up for our newsletter and be the first to know about coupons and special promotions.
© 2026, Watermainsupply