The Grundfos 800S is the 800 GPM class of the Grundfos SP submersible range, built for 10 in and larger wells. Pump and impellers are AISI 304 stainless steel. Each build here is a complete pump: the 800S pump end and a Grundfos submersible motor, supplied together under one part number, with a 6 in NPT discharge.
Typical uses listed by Grundfos include groundwater supply, irrigation, residential water pressure boosting and municipal wells.
The 800S range here runs on 6 in Grundfos MS6000C motors (20-40 HP). The motor size for each build is shown in the selector.
All builds are three-phase, at 230V or 460V.
Included: the 800S pump end and its Grundfos motor, factory-assembled as one complete pump.
Three-phase 230V and 460V builds: motor starter or drive required, ordered separately. Wire the motor through a magnetic starter or a drive (VFD) rated for its horsepower and voltage.
Drop cable and splice kit: sized to your setting depth and ordered separately.
24 months from date of installation, but not more than 30 months from date of manufacture. In Grundfos's words, products are âwarranted to the original user only to be free of defects in material and workmanshipâ; the full terms are in the installation and operating instructions on the Data Sheet tab.
| Specification | Value |
|---|---|
| Rated flow | 800 GPM |
| Horsepower | 20 to 40 HP |
| Discharge | 6 in NPT female |
| Minimum well size | 10 in |
| Voltage and phase | 230V 3Ph (20-30 HP); 460V 3Ph (20-40 HP) |
| Motors | 6 in Grundfos MS6000C (20-40 HP) |
| Liquid temperature | MS6000C 6 in: up to 104°F (40°C) |
| Approvals | cCSAus and CULDWUS (Grundfos Product Center codes) |
| Curve tolerance | ISO 9906 |
| Minimum submergence | 25 ft |
| Included | Pump end and motor, assembled as one complete pump |
Each table reads like the curve: the head the pump adds at shut-off, along its curve and at the rated flow of 800 GPM, out to the end of the published curve. Pick a model whose head at your flow covers the pumping level, the pressure you need at the surface (2.31 ft per psi) and pipe friction.
| Model | HP | 0 GPM (Shut-off) | 219 GPM | 548 GPM | 800 GPM (Rated) | 1095 GPM (Max) |
|---|---|---|---|---|---|---|
| 800S200-1A | 20 | 116 | 104 | 82 | 72 | 18 |
| 800S300-1 | 30 | 160 | 155 | 118 | 95-96 | 61 |
| 800S400-2AA | 40 | 220 | 207 | 170 | 143 | 43 |
Total head in feet. The shut-off and flow columns are read from the Grundfos 60 Hz curves, digitized from the published vector curves in the Grundfos SP 800S data sheet (60 Hz), at the nearest published point and rounded down. The (Rated) column is the nominal head Grundfos prints for each model at its rated flow, verbatim; where two figures are shown, builds on different motors or voltages differ slightly. Grundfos's curve and printed table disagree here. 800S: the published curve reads below the printed nominal head at 800 GPM by about 4% of shut-off head on the median model. Both are shown as published; we check your duty point against the curve before you order. 1 ft of head = 0.433 PSI. Full curves are in the product images and on the Data Sheet tab.
| Check | What to confirm |
|---|---|
| Well size | 10 in casing or larger |
| Submergence | At least 25 ft of water above the pump |
| Three phase | A magnetic starter or drive is needed and is not included |
| Power | Match horsepower, voltage and phase to your service |
| Water temperature | MS6000C 6 in: up to 104°F (40°C) |
| Duty point | Choose the model from the Grundfos curve at your flow and total head. Send us the pumping level, pipe run and pressure and we will check it against the curve |
| Part | Material |
|---|---|
| Pump | Stainless steel, EN 1.4301 (AISI 304) |
| Impellers | Stainless steel, EN 1.4301 (AISI 304) |
| Motor, 6 in MS6000C | Stainless steel, DIN W.-Nr. 1.4301 (AISI 304) |
Source: Grundfos Product Center.