Grundfos 62S SP 4 in Submersible Pump End

HP - Motor Dia: 3/4 HP - 4 in Motor
Model - Head: 62S7-2 - 40 ft at 62 GPM

Product variant with selected options does not exist!

Price
$1,192.80
Coupon 5% off applied automatically in your cart. No code needed.
SKU: 98924073
Weight : 11.0 lb
Loading locations...
Free Shipping $499 or more
Skip the chatbot. Talk to an expert.
1-888.510.4036 ¡ Same-day shipping available
Description
Grundfos ¡ Submersible Pump End
62S SP 4 in Pump End
62 GPM class stainless steel SP pump end, motor not included: 17 builds for 3/4 to 10 HP motors, on 4 in and 6 in motors.
62 GPM Rated Flow
3/4-10 HP
40-486 ft Nominal Head
2 in NPT Discharge
4 in and 6 in Motor Fit
NEMA Motor Flange
Built-In Check Valve
AISI 304 Stainless Steel
cCSAus
4.0-5.5 in Dia x 15.3-82.7 in L
11.0-52.9 lb Weight
Overview

The Grundfos 62S is the 62 GPM class of the SP 4 in submersible range, sold here as the pump end alone: stainless steel chambers and impellers with a built-in check valve, ready to mount on a submersible motor. Pump and impellers are AISI 304 stainless steel. Use it to rebuild an SP installation on a sound motor, or to build a pump around a motor you already have; the complete 62S pump with a Grundfos motor is listed separately.

The 62S pump end has a NEMA motor flange. Match the motor horsepower and diameter in the selector, and the flange to your motor; send us the motor model and we will confirm the fit.

What Ships and What It Needs to Run

Included: the Grundfos 62S SP pump end with its built-in check valve.

Submersible motor required, ordered separately. The pump end mounts on a 4 in or 6 in submersible motor with a NEMA motor flange, plus the motor’s control: a control box for a single-phase 3-wire motor, or a starter or drive for a three-phase motor. The motor horsepower and diameter for each build are in the Motor by Horsepower table under Models & Performance.

Genuine Grundfos equipment, factory-new in original packaging — sold and supported by Watermain Supply, an independent industrial supplier.
Warranty

24 months from date of installation, but not more than 30 months from date of manufacture. In Grundfos's words, products are “warranted to the original user only to be free of defects in material and workmanship”; the full terms are in the installation and operating instructions on the Data Sheet tab.

Specifications
Specification Value
Rated flow 62 GPM
Motor horsepower 3/4 to 10 HP
Motor 4 in or 6 in submersible motor, NEMA motor flange
Discharge 2 in NPT
Minimum well 4 / 6 in (4 in; 6 in for the sleeve (DS) builds)
Check valve Built in
Liquid temperature Up to 140°F (60°C) at the pump end; the motor sets the working limit
Approvals cCSAus and CULDWUS (Grundfos Product Center codes)
Curve tolerance ISO 9906
Included Pump end only; motor and its control ordered separately
Models & Performance — Will It Do What You Need?

Each table reads like the curve: the head the pump end on its matching motor adds at shut-off, along its curve and at the rated flow of 62 GPM, out to the end of the published curve. Pick a model whose head at your flow covers the pumping level, the pressure you need at the surface (2.31 ft per psi) and pipe friction.

Model HP 0 GPM (Shut-off) 16.1 GPM 40 GPM 62 GPM (Rated) 80.6 GPM (Max)
62S7-2 3/4 57 53 48 40 24
62S10-3 1 85 79 72 57-58 37
62S15-4 1-1/2 114 107 98 78-79 52
62S20-5 2 142 134 124 98 67
62S30-7 3 200 189 175 138-141 96
62S50-9 5 260 246 229 186 130
62S50-12 5 342 324 302 242 168
62S75-14 7-1/2 404 385 360 287-292 207
62S75-17 7-1/2 489 464 434 342-347 247
62S100-20 10 575 548 513 407-411 293
62S100-22 10 630 600 561 445-449 319
62S100-24 10 685 653 609 478-486 344

Total head in feet. The shut-off and flow columns are read from the Grundfos 60 Hz curves, digitized from the published vector curves in the Grundfos SP 62S data sheet (60 Hz), at the nearest published point and rounded down. The (Rated) column is the nominal head Grundfos prints for each model at its rated flow, verbatim; where two figures are shown, builds on different motors or voltages differ slightly. 1 ft of head = 0.433 PSI. Full curves are in the product images and on the Data Sheet tab.

Motor by Horsepower

Motor HP Motor Models
3/4 HP 4 in 62S7-2
1 HP 4 in 62S10-3
1-1/2 HP 4 in 62S15-4
2 HP 4 in 62S20-5
3 HP 4 in 62S30-7
5 HP 4 in 62S50-9, 62S50-12
7-1/2 HP 4 in or 6 in 62S75-14, 62S75-17
10 HP 4 in or 6 in 62S100-20, 62S100-22, 62S100-24

Grundfos US price list, January 2026. Grundfos motors for these builds are on our Grundfos MS 4 in motor and Grundfos MS 6 in motor listings. Add the motor's control: a control box for a single-phase 3-wire motor, a starter or drive for a three-phase motor.

What It Delivers on a 30/50 Pressure Switch

Output at 30 and 50 PSI ¡ 2 HP ¡ 1 model ¡ depths 20 to 30 ft

GPM at 30 PSI (switch cut-in), by depth to water

Model 20 ft 30 ft
62S20-5 69 63

GPM at 50 PSI (switch cut-out), by depth to water

Model 20 ft 30 ft
62S20-5 10.5 —
Output at 30 and 50 PSI ¡ 3 HP ¡ 1 model ¡ depths 30 to 80 ft

GPM at 30 PSI (switch cut-in), by depth to water

Model 30 ft 40 ft 50 ft 60 ft 70 ft 80 ft
62S30-7 79.5 76 72.5 68 63.5 58.5

GPM at 50 PSI (switch cut-out), by depth to water

Model 30 ft 40 ft 50 ft 60 ft 70 ft 80 ft
62S30-7 60 54.5 48 39 23.5 3.5
Output at 30 and 50 PSI ¡ 5 HP ¡ 1 model ¡ depths 70 to 140 ft

GPM at 30 PSI (switch cut-in), by depth to water

Model 70 ft 80 ft 100 ft 110 ft 130 ft 140 ft
62S50-9 78 75 69 65.5 57.5 53

GPM at 50 PSI (switch cut-out), by depth to water

Model 70 ft 80 ft 100 ft 110 ft 130 ft 140 ft
62S50-9 63 59 49 42.5 16 2
Output at 30 and 50 PSI ¡ 5 to 10 HP ¡ 6 models ¡ depths 100 to 550 ft

GPM at 30 PSI (switch cut-in), by depth to water

Model 100 ft 150 ft 190 ft 300 ft 400 ft 550 ft
62S50-12 80 69.5 58 — — —
62S75-14 — 78.5 71 34.5 — —
62S75-17 — — 78.5 59.5 11 —
62S100-20 — — — 70.5 52.5 —
62S100-22 — — — 74.5 60.5 4
62S100-24 — — — 78 66 36.5

GPM at 50 PSI (switch cut-out), by depth to water

Model 100 ft 150 ft 190 ft 300 ft 400 ft 550 ft
62S50-12 70 56 37 — — —
62S75-14 79 69.5 60 — — —
62S75-17 — 77.5 71.5 47 — —
62S100-20 — — 79 63 38.5 —
62S100-22 — — — 68.5 52 —
62S100-24 — — — 73 59.5 7

Calculated, not printed: Grundfos publishes no output table for the SP 62S. Each cell is the flow where the published 60 Hz curve meets the depth to water plus 69 ft (30 PSI) or 116 ft (50 PSI), interpolated between published points and rounded down to 0.5 GPM. 62S7-2, 62S10-3, 62S15-4 cannot hold 50 PSI from a 20 ft depth on the published curve and are left out. Riser and pipe friction are not included. A dash on the shallow side means the flow runs past the end of the published curve; on the deep side, the pump cannot reach that pressure (or gives under 1 GPM).

Before You Buy — The Limits That Decide the Fit
Check What to confirm
Motor A 4 in or 6 in submersible motor of the horsepower in the selector, with a NEMA motor flange; ordered separately
Motor control Control box for a single-phase 3-wire motor; starter or drive for a three-phase motor
Well size Casing ID at least 4 in; 6 in for the sleeve (DS) builds
Duty point Choose the model from the Grundfos curve at your flow and total head. Send us the pumping level, pipe run and pressure and we will check it against the curve
Materials of Construction
Part Material
Pump Stainless steel, EN 1.4301 (AISI 304)
Impellers Stainless steel, EN 1.4301 (AISI 304)

Source: Grundfos Product Center.

For engineering-led sizing and selection support or a factory submittal, email sales@watermainsupply.com or call 1-888.510.4036.
© Watermain Supply — A division of E4 Industrial LLC
Data Sheet
Videos

You May Also Like