Grundfos 625S SP 10 in Submersible Well Pump

HP - Motor Dia: 15 HP - 6 in Motor
Voltage - Phase: 230V 3Ph
Model - Head: 625S150-1A - 76 ft at 625 GPM

Product variant with selected options does not exist!

Price
$6,662.16
Coupon 5% off applied automatically in your cart. No code needed.
SKU: 17BG30A1
Weight : 185.0 lb
Loading locations...
Free Shipping $499 or more
Skip the chatbot. Talk to an expert.
1-888.510.4036 · Same-day shipping available
Description
Grundfos · Submersible Well Pump
625S SP
625 GPM class stainless steel submersible well pump for 10 in and larger wells: 8 complete builds from 15 HP to 40 HP on 6 in Grundfos motors, with a 6 in NPT discharge.
625 GPM Rated Flow
15-40 HP
76-203 ft Nominal Head
6 in NPT Discharge
10 in Min. Well
230V and 460V 3Ph
AISI 304 Stainless Steel
cCSAus
8.3 in Dia x 53.5-72.0 in L
189.9-266.8 lb Weight
Overview

The Grundfos 625S is the 625 GPM class of the Grundfos SP submersible range, built for 10 in and larger wells. Pump and impellers are AISI 304 stainless steel. Each build here is a complete pump: the 625S pump end and a Grundfos submersible motor, supplied together under one part number, with a 6 in NPT discharge.

Typical uses listed by Grundfos include groundwater supply, irrigation, residential water pressure boosting and municipal wells.

The 625S range here runs on 6 in Grundfos MS6000C motors (15-40 HP). The motor size for each build is shown in the selector.

All builds are three-phase, at 230V or 460V.

What Ships and What It Needs to Run

Included: the 625S pump end and its Grundfos motor, factory-assembled as one complete pump.

Three-phase 230V and 460V builds: motor starter or drive required, ordered separately. Wire the motor through a magnetic starter or a drive (VFD) rated for its horsepower and voltage.

Drop cable and splice kit: sized to your setting depth and ordered separately.

Genuine Grundfos equipment, factory-new in original packaging — sold and supported by Watermain Supply, an independent industrial supplier.
Warranty

24 months from date of installation, but not more than 30 months from date of manufacture. In Grundfos's words, products are “warranted to the original user only to be free of defects in material and workmanship”; the full terms are in the installation and operating instructions on the Data Sheet tab.

Specifications
Specification Value
Rated flow 625 GPM
Horsepower 15 to 40 HP
Discharge 6 in NPT female
Minimum well size 10 in
Voltage and phase 230V 3Ph (15-30 HP); 460V 3Ph (15-40 HP)
Motors 6 in Grundfos MS6000C (15-40 HP)
Liquid temperature MS6000C 6 in: up to 104°F (40°C)
Approvals cCSAus and CULDWUS (Grundfos Product Center codes)
Curve tolerance ISO 9906
Minimum submergence 10 ft
Included Pump end and motor, assembled as one complete pump
Models & Performance — Will It Do What You Need?

Each table reads like the curve: the head the pump adds at shut-off, along its curve and at the rated flow of 625 GPM, out to the end of the published curve. Pick a model whose head at your flow covers the pumping level, the pressure you need at the surface (2.31 ft per psi) and pipe friction.

Model HP 0 GPM (Shut-off) 172 GPM 429 GPM 625 GPM (Rated) 858 GPM (Max)
625S150-1A 15 100 97 82 76 24
625S250-1 25 145 140 117 101 61
625S300-2AA 30 191 191 167 143-144 48
625S400-2A 40 236 234 201 171 84
625S400-2 40 280 276 235 203 122

Total head in feet. The shut-off and flow columns are read from the Grundfos 60 Hz curves, digitized from the published vector curves in the Grundfos SP 625S data sheet (60 Hz), at the nearest published point and rounded down. The (Rated) column is the nominal head Grundfos prints for each model at its rated flow, verbatim; where two figures are shown, builds on different motors or voltages differ slightly. 1 ft of head = 0.433 PSI. Full curves are in the product images and on the Data Sheet tab.

Before You Buy — The Limits That Decide the Fit
Check What to confirm
Well size 10 in casing or larger
Submergence At least 10 ft of water above the pump
Three phase A magnetic starter or drive is needed and is not included
Power Match horsepower, voltage and phase to your service
Water temperature MS6000C 6 in: up to 104°F (40°C)
Duty point Choose the model from the Grundfos curve at your flow and total head. Send us the pumping level, pipe run and pressure and we will check it against the curve
Materials of Construction
Part Material
Pump Stainless steel, EN 1.4301 (AISI 304)
Impellers Stainless steel, EN 1.4301 (AISI 304)
Motor, 6 in MS6000C Stainless steel, DIN W.-Nr. 1.4301 (AISI 304)

Source: Grundfos Product Center.

For engineering-led sizing and selection support or a factory submittal, email sales@watermainsupply.com or call 1-888.510.4036.
© Watermain Supply — A division of E4 Industrial LLC
Data Sheet
Videos

You May Also Like