The Grundfos 300S is the 300 GPM class of the Grundfos SP submersible range, built for 6 in and larger wells. Pump and impellers are AISI 304 stainless steel. Each build here is a complete pump: the 300S pump end and a Grundfos submersible motor, supplied together under one part number, with a 3-4 in NPT discharge.
Typical uses listed by Grundfos include groundwater supply, irrigation, residential water pressure boosting and municipal wells.
The 300S range here runs on 4 in Grundfos MS4000 motors (3-10 HP) and 6 in Grundfos MS6000C motors (7-1/2-40 HP). The motor size for each build is shown in the selector.
Single-phase builds (3-5 HP, 230V) use a 3-wire motor and run through a Grundfos control box, sold separately. Three-phase builds are available at 230V or 460V.
Included: the 300S pump end and its Grundfos motor, factory-assembled as one complete pump.
Single-phase 230V builds (3-5 HP, 3-wire): control box required, ordered separately. Use the Grundfos SA-SPM6 3-wire control box listed for each build in the Control Box by Horsepower table under Models & Performance.
Three-phase 230V and 460V builds: motor starter or drive required, ordered separately. Wire the motor through a magnetic starter or a drive (VFD) rated for its horsepower and voltage.
Drop cable and splice kit: sized to your setting depth and ordered separately.
24 months from date of installation, but not more than 30 months from date of manufacture. In Grundfos's words, products are “warranted to the original user only to be free of defects in material and workmanship”; the full terms are in the installation and operating instructions on the Data Sheet tab.
| Specification | Value |
|---|---|
| Rated flow | 300 GPM |
| Horsepower | 3 to 40 HP |
| Discharge | 3 in NPT female; 4 in NPT female on the 300S300-7, 300S250-7AA, 300S300-8, 300S400-9, 300S300-9B and 300S400-10 |
| Minimum well size | 6 in |
| Voltage and phase | 230V 1Ph (3-5 HP, 3-wire); 230V 3Ph (3-30 HP); 460V 3Ph (3-40 HP) |
| Motors | 4 in Grundfos MS4000 (3-10 HP); 6 in Grundfos MS6000C (7-1/2-40 HP) |
| Liquid temperature | MS4000 4 in: up to 104°F (40°C); MS6000C 6 in: up to 104°F (40°C) |
| Approvals | cCSAus on every build listed by Grundfos; most builds also carry CULDWUS (Grundfos Product Center codes) |
| Curve tolerance | ISO 9906 |
| Minimum submergence | 8 ft |
| Included | Pump end and motor, assembled as one complete pump |
Each table reads like the curve: the head the pump adds at shut-off, along its curve and at the rated flow of 300 GPM, out to the end of the published curve. Pick a model whose head at your flow covers the pumping level, the pressure you need at the surface (2.31 ft per psi) and pipe friction.
| Model | HP | 0 GPM (Shut-off) | 75 GPM | 187 GPM | 300 GPM (Rated) | 374 GPM |
|---|---|---|---|---|---|---|
| 300S30-1B | 3 | 48 | 43 | 31 | 29-30 | 2 |
| 300S50-1 | 5 | 63 | 62 | 46 | 38 | 19 |
| 300S50-2BB | 5 | 90 | 83 | 66 | 57 | 15 |
| 300S75-2 | 7-1/2 | 130 | 126 | 98 | 77-78 | 48 |
| 300S100-3A | 10 | 177 | 171 | 135 | 107 | 61 |
| 300S150-3 | 15 | 200 | 193 | 152 | 119 | 77 |
| 300S150-4AA | 15 | 224 | 217 | 173 | 138-139 | 77 |
| 300S150-4 | 15 | 267 | 257 | 205 | 157-158 | 105 |
| 300S200-5AA | 20 | 295 | 286 | 232 | 179-180 | 108 |
| Model | HP | 0 GPM (Shut-off) | 75 GPM | 187 GPM | 300 GPM (Rated) | 374 GPM |
|---|---|---|---|---|---|---|
| 300S200-5 | 20 | 334 | 321 | 257 | 200-201 | 134 |
| 300S200-6B | 20 | 385 | 372 | 302 | 222-224 | 156 |
| 300S250-6 | 25 | 410 | 393 | 317 | 243-244 | 170 |
| 300S250-7AA | 25 | — | — | — | 260-262 | — |
| 300S300-7 | 30 | 473 | 455 | 368 | 283-285 | 198 |
| 300S300-8 | 30 | 540 | 519 | 420 | 321-324 | 223 |
| 300S300-9B | 30 | 580 | 556 | 451 | 343-346 | 232 |
| 300S400-9 | 40 | 604 | 579 | 468 | 370 | 249 |
| 300S400-10 | 40 | 680 | 653 | 531 | 409 | 287 |
Total head in feet. The shut-off and flow columns are read from the Grundfos 60 Hz curves, digitized from the published vector curves in the Grundfos SP 300S data sheet (60 Hz), at the nearest published point and rounded down. The (Rated) column is the nominal head Grundfos prints for each model at its rated flow, verbatim; where two figures are shown, builds on different motors or voltages differ slightly. 300S: curves end at 374 GPM to 412 GPM; the last column is the last flow every 300S curve reaches. Grundfos's curve and printed table disagree here. 300S: the published curve reads below the printed nominal head at 300 GPM by about 4% of shut-off head on the median model. Both are shown as published; we check your duty point against the curve before you order. No published curve for 300S250-7AA: rated figure only, full curve on request. 1 ft of head = 0.433 PSI. Full curves are in the product images and on the Data Sheet tab.
Control Box by Horsepower (single-phase 3-wire builds)
| Motor HP | Models | Control box |
|---|---|---|
| 3 HP | 300S30-1B | 98315258 |
| 5 HP | 300S50-1, 300S50-2BB | 98315260 |
Grundfos US price list, January 2026. Every box is on our Grundfos SA-SPM6 3-Wire Control Box listing; Deluxe boxes add a magnetic starter. Three-phase builds need a magnetic starter or drive instead.
| Check | What to confirm |
|---|---|
| Well size | 6 in casing or larger |
| Submergence | At least 8 ft of water above the pump |
| Single phase | A Grundfos control box is required and sold separately: 98315258 (3 HP), 98315260 (5 HP) |
| Three phase | A magnetic starter or drive is needed and is not included |
| Power | Match horsepower, voltage and phase to your service. Single-phase and three-phase builds are not interchangeable |
| Water temperature | MS4000 4 in: up to 104°F (40°C); MS6000C 6 in: up to 104°F (40°C) |
| Part | Material |
|---|---|
| Pump | Stainless steel, EN 1.4301 (AISI 304) |
| Impellers | Stainless steel, EN 1.4301 (AISI 304) |
| Motor, 4 in MS4000 | Stainless steel, EN 1.4301 (AISI 304) |
| Motor, 6 in MS6000C | Stainless steel, DIN W.-Nr. 1.4301 (AISI 304) |
Source: Grundfos Product Center.