Menu
Product variant with selected options does not exist!
files/grundfos-sp-4-in-pump-end_38c2faac-54b9-4bbe-b8eb-eb4b3ebc19cf.jpg
08:11 PM
The Grundfos 25S is the 25 GPM class of the SP 4 in submersible range, sold here as the pump end alone: stainless steel chambers and impellers with a built-in check valve, ready to mount on a submersible motor. Pump and impellers are AISI 304 stainless steel. Use it to rebuild an SP installation on a sound motor, or to build a pump around a motor you already have; the complete 25S pump with a Grundfos motor is listed separately.
The 25S pump end has a Grundfos motor flange and a splined or cylindrical shaft end, per build. Match the motor horsepower and diameter in the selector, and the flange to your motor; send us the motor model and we will confirm the fit.
Included: the Grundfos 25S SP pump end with its built-in check valve; DS builds come built into a stainless steel sleeve.
Submersible motor required, ordered separately. The pump end mounts on a 4 in or 6 in submersible motor with a Grundfos motor flange, plus the motorâs control: a control box for a single-phase 3-wire motor, or a starter or drive for a three-phase motor. The motor horsepower and diameter for each build are in the Motor by Horsepower table under Models & Performance.
24 months from date of installation, but not more than 30 months from date of manufacture. In Grundfos's words, products are âwarranted to the original user only to be free of defects in material and workmanshipâ; the full terms are in the installation and operating instructions on the Data Sheet tab.
| Specification | Value |
|---|---|
| Rated flow | 25 GPM |
| Motor horsepower | 1/2 to 10 HP |
| Motor | 4 in or 6 in submersible motor, Grundfos motor flange |
| Discharge | 1-1/2 in NPT; male on DS builds |
| Minimum well | 4 / 6 in (4 in; 6 in for the sleeve (DS) builds) |
| Check valve | Built in |
| Liquid temperature | Up to 140°F (60°C) at the pump end; the motor sets the working limit |
| Approvals | cCSAus and CULDWUS (Grundfos Product Center codes) |
| Curve tolerance | ISO 9906 |
| Included | Pump end only; motor and its control ordered separately |
Each table reads like the curve: the head the pump end on its matching motor adds at shut-off, along its curve and at the rated flow of 25 GPM, out to the end of the published curve. Pick a model whose head at your flow covers the pumping level, the pressure you need at the surface (2.31 ft per psi) and pipe friction.
| Model | HP | 0 GPM (Shut-off) | 6.9 GPM | 17.1 GPM | 25 GPM (Rated) | 34.3 GPM (Max) |
|---|---|---|---|---|---|---|
| 25S05-3 | 1/2 | 91 | 83 | 74 | 64 | 34 |
| 25S07-5 | 3/4 | 151 | 138 | 122 | 105 | 54 |
| 25S10-7 | 1 | 212 | 193 | 170 | 146 | 75 |
| 25S15-9 | 1-1/2 | 273 | 249 | 221 | 189 | 99 |
| 25S20-11 | 2 | 333 | 304 | 268 | 229 | 119 |
| 25S30-15 | 3 | 455 | 416 | 368 | 314 | 165 |
| 25S50-26 | 5 | 789 | 722 | 639 | 546 | 288 |
| 25S75-39 | 7-1/2 | 1180 | 1080 | 955 | â | 427 |
| 25S75-39DS | 7-1/2 | 1180 | 1080 | 955 | 815 | 427 |
| 25S100-52DS | 10 | 1575 | 1435 | 1266 | 1082 | 560 |
Total head in feet. The shut-off and flow columns are read from the Grundfos 60 Hz curves, digitized from the published vector curves in the Grundfos SP 25S data sheet (60 Hz), at the nearest published point and rounded down. The (Rated) column is the nominal head Grundfos prints for each model at its rated flow, verbatim; where two figures are shown, builds on different motors or voltages differ slightly. 1 ft of head = 0.433 PSI. Full curves are in the product images and on the Data Sheet tab.
Motor by Horsepower
| Motor HP | Motor | Models |
|---|---|---|
| 1/2 HP | 4 in | 25S05-3 |
| 3/4 HP | 4 in | 25S07-5 |
| 1 HP | 4 in | 25S10-7 |
| 1-1/2 HP | 4 in | 25S15-9 |
| 2 HP | 4 in | 25S20-11 |
| 3 HP | 4 in | 25S30-15 |
| 5 HP | 4 in | 25S50-26 |
| 7-1/2 HP | 4 in or 6 in | 25S75-39, 25S75-39DS |
| 10 HP | 6 in | 25S100-52DS |
Grundfos US price list, January 2026. Grundfos motors for these builds are on our Grundfos MS 4 in motor and Grundfos MS 6 in motor listings. Add the motor's control: a control box for a single-phase 3-wire motor, a starter or drive for a three-phase motor.
What It Delivers on a 30/50 Pressure Switch
GPM at 30 PSI (switch cut-in), by depth to pumping water level
| Model | 20 ft |
|---|---|
| 25S05-3 | 10.5 |
GPM at 50 PSI (switch cut-out), by depth to pumping water level
| Model | 20 ft |
|---|---|
| 25S05-3 | â |
GPM at 30 PSI (switch cut-in), by depth to pumping water level
| Model | 20 ft | 60 ft | 120 ft | 180 ft | 220 ft | 260 ft | 340 ft |
|---|---|---|---|---|---|---|---|
| 25S07-5 | 27.1 | 12.3 | â | â | â | â | â |
| 25S10-7 | 33.0 | 26.5 | 9.6 | â | â | â | â |
| 25S15-9 | â | 31.3 | 23.7 | 7.8 | â | â | â |
| 25S20-11 | â | â | 28.7 | 20.6 | 12.0 | 3.5 | â |
| 25S30-15 | â | â | 33.0 | 29.2 | 26.2 | 22.1 | 9.3 |
GPM at 50 PSI (switch cut-out), by depth to pumping water level
| Model | 20 ft | 60 ft | 120 ft | 180 ft | 220 ft | 260 ft | 340 ft |
|---|---|---|---|---|---|---|---|
| 25S07-5 | 10.1 | â | â | â | â | â | â |
| 25S10-7 | 25.3 | 14.3 | â | â | â | â | â |
| 25S15-9 | 30.6 | 25.5 | 12.3 | â | â | â | â |
| 25S20-11 | â | 29.8 | 23.3 | 10.4 | 2.7 | â | â |
| 25S30-15 | â | â | 30.0 | 25.7 | 21.3 | 15.3 | 2.2 |
GPM at 30 PSI (switch cut-in), by depth to pumping water level
| Model | 220 ft | 260 ft | 340 ft | 460 ft | 600 ft | 900 ft | 1100 ft |
|---|---|---|---|---|---|---|---|
| 25S50-26 | â | â | 29.9 | 24.7 | 13.5 | â | â |
| 25S75-39* | â | â | â | 32 | 28.5 | 16 | â |
| 25S75-39DS* | â | â | â | 32 | 28.5 | 16 | â |
| 25S100-52DS* | â | â | â | â | 32.5 | 26.5 | 21 |
GPM at 50 PSI (switch cut-out), by depth to pumping water level
| Model | 220 ft | 260 ft | 340 ft | 460 ft | 600 ft | 900 ft | 1100 ft |
|---|---|---|---|---|---|---|---|
| 25S50-26 | 32.7 | 31.2 | 28.2 | 21.8 | 8.5 | â | â |
| 25S75-39* | â | â | 33.5 | 31 | 27 | 12 | â |
| 25S75-39DS* | â | â | 33.5 | 31 | 27 | 12 | â |
| 25S100-52DS* | â | â | â | 34 | 31.5 | 25.5 | 19 |
Printed values: copied as printed from the Grundfos 25 gpm easy selection chart (SQ, SQE, SmartFlo and SP data booklet, 60 Hz, p. 60), in GPM by depth to pumping water level at the pressure shown. Grundfos notes the values are approximate. They track the published curve at depth plus pressure head, so riser and pipe friction are not allowed for; add them on a long or small-diameter drop. A dash means Grundfos prints no value at that depth: on the shallow side the pump runs past the end of its curve, on the deep side it cannot reach that pressure. * Calculated, not printed: Grundfos prints no chart row for 25S75-39, 25S75-39DS, 25S100-52DS. Those cells are the flow where the published 60 Hz curve meets the depth plus 69 ft (30 PSI) or 116 ft (50 PSI), interpolated between published points and rounded down to 0.5 GPM.
| Check | What to confirm |
|---|---|
| Motor | A 4 in or 6 in submersible motor of the horsepower in the selector, with a Grundfos motor flange; ordered separately |
| Motor control | Control box for a single-phase 3-wire motor; starter or drive for a three-phase motor |
| Well size | Casing ID at least 4 in; 6 in for the sleeve (DS) builds |
| Duty point | Choose the model from the Grundfos curve at your flow and total head. Send us the pumping level, pipe run and pressure and we will check it against the curve |
| Part | Material |
|---|---|
| Pump | Stainless steel, EN 1.4301 (AISI 304) |
| Impellers | Stainless steel, EN 1.4301 (AISI 304) |
Source: Grundfos Product Center.
Sign up for our newsletter and be the first to know about coupons and special promotions.
© 2026, Watermainsupply