Menu
Product variant with selected options does not exist!
files/grundfos-160s-sp-submersible-well-pump_f72cd869-1a88-44cf-985d-af11608b538b.jpg
09:37 PM
The Grundfos 160S is the 160 GPM class of the Grundfos SP submersible range, built for 6 in and larger wells. Pump and impellers are AISI 304 stainless steel. Each build here is a complete pump: the 160S pump end and a Grundfos submersible motor, supplied together under one part number, with a 3 in NPT discharge.
Typical uses listed by Grundfos include groundwater supply, irrigation, residential water pressure boosting and municipal wells.
Builds from 2 HP to 7-1/2 HP run on a 4 in Grundfos MS4000 motor. The 160S75-4 and 160S100-5 come on a 4 in MS4000 or a 6 in MS6000C motor, and 15 HP to 40 HP run on the 6 in MS6000C. The 50 HP and 60 HP builds on a 6 in motor use the Grundfos MMS6, and the largest builds (160S600-33, -36 and 160S750-39) use the 8 in MMS8000. The 160S500-29, 160S600-31, -33, -36 and 160S750-39 are built into a stainless steel sleeve with an NPT male discharge.
The two single-phase builds (160S20-1 at 2 HP and 160S50-2 at 5 HP, 230V) use a 3-wire motor and run through a Grundfos control box, sold separately. Three-phase builds are available at 230V or 460V.
Included: the 160S pump end and its Grundfos motor, factory-assembled as one complete pump.
Single-phase 230V builds (2-5 HP, 3-wire): control box required, ordered separately. Use the Grundfos SA-SPM6 3-wire control box listed for each build in the Control Box by Horsepower table under Models & Performance.
Three-phase 230V and 460V builds: motor starter or drive required, ordered separately. Wire the motor through a magnetic starter or a drive (VFD) rated for its horsepower and voltage.
Drop cable and splice kit: sized to your setting depth and ordered separately.
24 months from date of installation, but not more than 30 months from date of manufacture. In Grundfos's words, products are “warranted to the original user only to be free of defects in material and workmanship”; the full terms are in the installation and operating instructions on the Data Sheet tab.
| Specification | Value |
|---|---|
| Rated flow | 160 GPM |
| Horsepower | 2 to 75 HP |
| Discharge | 3 in NPT female; 3 in NPT male on the 160S500-29, 160S600-31, -33, -36 and 160S750-39 |
| Minimum well size | 6 in; 8 in for the 160S500-29, 160S600-31, -33, -36 and 160S750-39 |
| Voltage and phase | 230V 1Ph (2-5 HP, 3-wire); 230V 3Ph (5-30 HP); 460V 3Ph (5-75 HP) |
| Motors | 4 in Grundfos MS4000 (2-10 HP); 6 in Grundfos MS6000C (7-1/2-40 HP); 6 in Grundfos MMS6 (40-60 HP); 8 in Grundfos MMS8000 (60-75 HP) |
| Liquid temperature | MS4000 4 in: up to 104°F (40°C); MS6000C 6 in: up to 104°F (40°C); MMS6 6 in (160S600-31): up to 104°F (40°C) with 1.6 ft/s flow past the motor; MMS6 6 in (160S500-28 and -29): up to 122°F (50°C) with 1.6 ft/s flow past the motor; MMS8000 8 in: up to 113°F (45°C) with 1.6 ft/s flow past the motor |
| Approvals | cCSAus on every build listed by Grundfos; the non-sleeve builds also carry CULDWUS (Grundfos Product Center codes) |
| Curve tolerance | ISO 9906 |
| Minimum submergence | 5 ft |
| Included | Pump end and motor, assembled as one complete pump |
Each table reads like the curve: the head the pump adds at shut-off, along its curve and at the rated flow of 160 GPM, out to the end of the published curve. Pick a model whose head at your flow covers the pumping level, the pressure you need at the surface (2.31 ft per psi) and pipe friction.
| Model | HP | 0 GPM (Shut-off) | 42 GPM | 104 GPM | 160 GPM (Rated) | 207.9 GPM (Max) |
|---|---|---|---|---|---|---|
| 160S20-1 | 2 | 45 | 46 | 40 | 39 | 12 |
| 160S50-2 | 5 | 96 | 96 | 83 | 78-79 | 35 |
| 160S75-3 | 7-1/2 | 147 | 145 | 127 | 118 | 58 |
| 160S75-4 | 7-1/2 | 199 | 194 | 171 | 154-156 | 81 |
| 160S100-5 | 10 | 248 | 244 | 215 | 195-196 | 104 |
| 160S150-6 | 15 | 299 | 293 | 258 | 238-239 | 127 |
| 160S150-7 | 15 | 350 | 342 | 302 | 276-277 | 151 |
| 160S150-8 | 15 | 400 | 391 | 346 | 313-314 | 174 |
| 160S150-9 | 15 | 451 | 441 | 390 | 357-359 | 197 |
| Model | HP | 0 GPM (Shut-off) | 42 GPM | 104 GPM | 160 GPM (Rated) | 207.9 GPM (Max) |
|---|---|---|---|---|---|---|
| 160S200-10 | 20 | 500 | 490 | 433 | 395-397 | 220 |
| 160S200-11 | 20 | 553 | 540 | 477 | 431-435 | 243 |
| 160S200-12 | 20 | 604 | 589 | 521 | 477-479 | 266 |
| 160S250-13 | 25 | 655 | 639 | 565 | 514-517 | 289 |
| 160S250-14 | 25 | 705 | 688 | 608 | 550-554 | 312 |
| 160S250-15 | 25 | 756 | 737 | 652 | 592-596 | 335 |
| 160S300-16 | 30 | 807 | 787 | 696 | 628-633 | 358 |
| 160S300-17 | 30 | 859 | 836 | 740 | 664-670 | 382 |
| 160S300-18 | 30 | 909 | 885 | 783 | 721 | 405 |
| Model | HP | 0 GPM (Shut-off) | 42 GPM | 104 GPM | 160 GPM (Rated) | 207.9 GPM (Max) |
|---|---|---|---|---|---|---|
| 160S400-20 | 40 | 1011 | 984 | 871 | 797 | 450 |
| 160S400-22 | 40 | 1112 | 1083 | 958 | 871 | 497 |
| 160S400-24 | 40 | 1213 | 1181 | 1046 | 954 | 543 |
| 160S500-28 | 50 | 1420 | 1379 | 1221 | 1100 | 635 |
| 160S500-29 | 50 | 1467 | 1428 | 1264 | 1131 | 658 |
| 160S600-31 | 60 | 1569 | 1526 | 1352 | 1209 | 704 |
| 160S600-33 | 60 | 1670 | 1625 | 1439 | 1332 | 751 |
| 160S600-36 | 60 | 1819 | 1773 | 1571 | 1467 | 820 |
| 160S750-39 | 75 | 1975 | 1922 | 1702 | 1584 | 889 |
Total head in feet. The shut-off and flow columns are read from the Grundfos 60 Hz curves, digitized from the published vector curves in the Grundfos SP 160S data sheet (60 Hz), at the nearest published point and rounded down. The (Rated) column is the nominal head Grundfos prints for each model at its rated flow, verbatim; where two figures are shown, builds on different motors or voltages differ slightly. Grundfos's curve and printed table disagree here. 160S: the published curve reads below the printed nominal head at 160 GPM by about 8% of shut-off head on the median model. Both are shown as published; we check your duty point against the curve before you order. 1 ft of head = 0.433 PSI. Full curves are in the product images and on the Data Sheet tab.
Control Box by Horsepower (single-phase 3-wire builds)
| Motor HP | Models | Control box |
|---|---|---|
| 2 HP | 160S20-1 | 98315256 |
| 5 HP | 160S50-2 | 98315260 |
Grundfos US price list, January 2026. Every box is on our Grundfos SA-SPM6 3-Wire Control Box listing; Deluxe boxes add a magnetic starter. Three-phase builds need a magnetic starter or drive instead.
| Check | What to confirm |
|---|---|
| Well size | 6 in casing or larger; 8 in or larger for the 160S500-29, 160S600-31, -33, -36 and 160S750-39 |
| Submergence | At least 5 ft of water above the pump |
| Single phase | A Grundfos control box is required and sold separately: 98315256 (2 HP), 98315260 (5 HP) |
| Three phase | A magnetic starter or drive is needed and is not included |
| Power | Match horsepower, voltage and phase to your service. Single-phase and three-phase builds are not interchangeable |
| Water temperature | MS4000 4 in: up to 104°F (40°C); MS6000C 6 in: up to 104°F (40°C); MMS6 6 in (160S600-31): up to 104°F (40°C) with 1.6 ft/s flow past the motor; MMS6 6 in (160S500-28 and -29): up to 122°F (50°C) with 1.6 ft/s flow past the motor; MMS8000 8 in: up to 113°F (45°C) with 1.6 ft/s flow past the motor |
| Part | Material |
|---|---|
| Pump | Stainless steel, EN 1.4301 (AISI 304) |
| Impellers | Stainless steel, EN 1.4301 (AISI 304) |
| Motor, 4 in MS4000 | Stainless steel, EN 1.4301 (AISI 304) |
| Motor, 6 in MS6000C | Stainless steel, DIN W.-Nr. 1.4301 (AISI 304) |
| Motor, 6 in MMS6 | Cast iron, DIN W.-Nr. 0.6025 (ASTM Class 35-40) (160S500-28 and -29); Stainless steel, DIN W.-Nr. 1.4401 (AISI 316) (160S600-31) |
| Motor, 8 in MMS8000 | Cast iron, DIN W.-Nr. 0.6025 (ASTM Class 35-40) |
Source: Grundfos Product Center.
Sign up for our newsletter and be the first to know about coupons and special promotions.
© 2026, Watermainsupply