Menu
Product variant with selected options does not exist!
files/grundfos-1100s-sp-submersible-well-pump_07f20b6b-81df-4a09-a8cb-6a822f84025e.jpg
09:37 PM
The Grundfos 1100S is the 1100 GPM class of the Grundfos SP submersible range, built for 10 in and larger wells. Pump and impellers are AISI 304 stainless steel. Each build here is a complete pump: the 1100S pump end and a Grundfos submersible motor, supplied together under one part number, with a 6 in NPT discharge.
Typical uses listed by Grundfos include groundwater supply, irrigation, residential water pressure boosting and municipal wells.
The 1100S range here runs on 6 in Grundfos MS6000C motors (30-40 HP), 8 in Grundfos MMS8000 motors (60-150 HP) and 10 in Grundfos MMS10000 motors (200-250 HP). The motor size for each build is shown in the selector.
All builds are three-phase, at 230V or 460V.
Included: the 1100S pump end and its Grundfos motor, factory-assembled as one complete pump.
Three-phase 230V and 460V builds: motor starter or drive required, ordered separately. Wire the motor through a magnetic starter or a drive (VFD) rated for its horsepower and voltage.
Drop cable and splice kit: sized to your setting depth and ordered separately.
24 months from date of installation, but not more than 30 months from date of manufacture. In Grundfos's words, products are âwarranted to the original user only to be free of defects in material and workmanshipâ; the full terms are in the installation and operating instructions on the Data Sheet tab.
| Specification | Value |
|---|---|
| Rated flow | 1100 GPM |
| Horsepower | 30 to 250 HP |
| Discharge | 6 in NPT female |
| Minimum well size | 10 in |
| Voltage and phase | 230V 3Ph (30 HP); 460V 3Ph (30-250 HP) |
| Motors | 6 in Grundfos MS6000C (30-40 HP); 8 in Grundfos MMS8000 (60-150 HP); 10 in Grundfos MMS10000 (200-250 HP) |
| Liquid temperature | MS6000C 6 in: up to 104°F (40°C); MMS8000 8 in (1100S1500-4, -4A and -4AA): up to 104°F (40°C) with 1.6 ft/s flow past the motor; MMS8000 8 in (1100S600-2AA, 1100S750-2A, 1100S1000-2, -3AA, 1100S1250-3 and -3A): up to 113°F (45°C) with 1.6 ft/s flow past the motor; MMS10000 10 in (1100S2500-6, -6A and -6AA): up to 95°F (35°C) with 1.6 ft/s flow past the motor; MMS10000 10 in (1100S2000-5): up to 113°F (45°C) with 1.6 ft/s flow past the motor |
| Approvals | cCSAus and CULDWUS (Grundfos Product Center codes) |
| Curve tolerance | ISO 9906 |
| Minimum submergence | 30 ft |
| Included | Pump end and motor, assembled as one complete pump |
Each table reads like the curve: the head the pump adds at shut-off, along its curve and at the rated flow of 1100 GPM, out to the end of the published curve. Pick a model whose head at your flow covers the pumping level, the pressure you need at the surface (2.31 ft per psi) and pipe friction.
| Model | HP | 0 GPM (Shut-off) | 295 GPM | 736 GPM | 1100 GPM (Rated) | 1473 GPM (Max) |
|---|---|---|---|---|---|---|
| 1100S300-1A | 30 | 126 | 122 | 100 | 77-89 | 14 |
| 1100S400-1 | 40 | 183 | 172 | 136 | 109 | 54 |
| 1100S600-2AA | 60 | 260 | 254 | 218 | 180 | 58 |
| 1100S750-2A | 75 | 318 | 305 | 256 | 217 | 99 |
| 1100S1000-2 | 100 | 374 | 356 | 289 | 230 | 141 |
| 1100S1000-3AA | 100 | 450 | 434 | 371 | 314 | 135 |
| 1100S1250-3A | 125 | 503 | 484 | 403 | 319 | 175 |
| 1100S1250-3 | 125 | 557 | 533 | 434 | 340 | 215 |
| Model | HP | 0 GPM (Shut-off) | 295 GPM | 736 GPM | 1100 GPM (Rated) | 1473 GPM (Max) |
|---|---|---|---|---|---|---|
| 1100S1500-4AA | 150 | 634 | 612 | 517 | 411 | 212 |
| 1100S1500-4A | 150 | 687 | 661 | 548 | 431 | 250 |
| 1100S1500-4 | 150 | 739 | 710 | 579 | 450 | 290 |
| 1100S2000-5 | 200 | 939 | 907 | 745 | 577 | 390 |
| 1100S2500-6AA | 250 | â | â | â | 658 | â |
| 1100S2500-6A | 250 | â | â | â | 673 | â |
| 1100S2500-6 | 250 | â | â | â | 703 | â |
Total head in feet. The shut-off and flow columns are read from the Grundfos 60 Hz curves, digitized from the published vector curves in the Grundfos SP 1100S data sheet (60 Hz), at the nearest published point and rounded down. The (Rated) column is the nominal head Grundfos prints for each model at its rated flow, verbatim; where two figures are shown, builds on different motors or voltages differ slightly. No published curve for 1100S2500-6AA, 1100S2500-6A, 1100S2500-6: rated figure only, full curve on request. 1 ft of head = 0.433 PSI. Full curves are in the product images and on the Data Sheet tab.
| Check | What to confirm |
|---|---|
| Well size | 10 in casing or larger |
| Submergence | At least 30 ft of water above the pump |
| Three phase | A magnetic starter or drive is needed and is not included |
| Power | Match horsepower, voltage and phase to your service |
| Water temperature | MS6000C 6 in: up to 104°F (40°C); MMS8000 8 in (1100S1500-4, -4A and -4AA): up to 104°F (40°C) with 1.6 ft/s flow past the motor; MMS8000 8 in (1100S600-2AA, 1100S750-2A, 1100S1000-2, -3AA, 1100S1250-3 and -3A): up to 113°F (45°C) with 1.6 ft/s flow past the motor; MMS10000 10 in (1100S2500-6, -6A and -6AA): up to 95°F (35°C) with 1.6 ft/s flow past the motor; MMS10000 10 in (1100S2000-5): up to 113°F (45°C) with 1.6 ft/s flow past the motor |
| Duty point | Choose the model from the Grundfos curve at your flow and total head. Send us the pumping level, pipe run and pressure and we will check it against the curve |
| Part | Material |
|---|---|
| Pump | Stainless steel, EN 1.4301 (AISI 304) |
| Impellers | Stainless steel, EN 1.4301 (AISI 304) |
| Motor, 6 in MS6000C | Stainless steel, DIN W.-Nr. 1.4301 (AISI 304) |
| Motor, 8 in MMS8000 | Cast iron, DIN W.-Nr. 0.6025 (ASTM Class 35-40) |
| Motor, 10 in MMS10000 | Cast iron, DIN W.-Nr. 0.6025 (ASTM Class 35-40) |
Source: Grundfos Product Center.
Sign up for our newsletter and be the first to know about coupons and special promotions.
© 2026, Watermainsupply