Grundfos 5S SP 4 in Submersible Pump End

HP: 1/2 HP
Model - Head: 5S05-9 - 184 ft at 5 GPM

Product variant with selected options does not exist!

Price
$935.36
Coupon 5% off applied automatically in your cart. No code needed.
SKU: 8010009
Weight : 9.0 lb
Loading locations...
Free Shipping $499 or more
Skip the chatbot. Talk to an expert.
1-888.510.4036 · Same-day shipping available
Description
Grundfos · Submersible Pump End
5S SP 4 in Pump End
5 GPM class stainless steel SP pump end, motor not included: 8 builds for 1/2 to 3 HP motors.
5 GPM Rated Flow
1/2-3 HP
184-909 ft Nominal Head
1 in NPT Discharge
4 in Motor Fit
Grundfos Motor Flange
Built-In Check Valve
AISI 304 Stainless Steel
cCSAus
4.0-4.2 in Dia x 13.5-47.6 in L
9.7-20.9 lb Weight
Overview

The Grundfos 5S is the 5 GPM class of the SP 4 in submersible range, sold here as the pump end alone: stainless steel chambers and impellers with a built-in check valve, ready to mount on a submersible motor. Pump and impellers are AISI 304 stainless steel. Use it to rebuild an SP installation on a sound motor, or to build a pump around a motor you already have; the complete 5S pump with a Grundfos motor is listed separately.

The 5S pump end has a Grundfos motor flange and a splined or cylindrical shaft end, per build. Match the motor horsepower and diameter in the selector, and the flange to your motor; send us the motor model and we will confirm the fit.

What Ships and What It Needs to Run

Included: the Grundfos 5S SP pump end with its built-in check valve; DS builds come built into a stainless steel sleeve.

Submersible motor required, ordered separately. The pump end mounts on a 4 in submersible motor with a Grundfos motor flange, plus the motor’s control: a control box for a single-phase 3-wire motor, or a starter or drive for a three-phase motor. The motor horsepower and diameter for each build are in the Motor by Horsepower table under Models & Performance.

Genuine Grundfos equipment, factory-new in original packaging — sold and supported by Watermain Supply, an independent industrial supplier.
Warranty

24 months from date of installation, but not more than 30 months from date of manufacture. In Grundfos's words, products are “warranted to the original user only to be free of defects in material and workmanship”; the full terms are in the installation and operating instructions on the Data Sheet tab.

Specifications
Specification Value
Rated flow 5 GPM
Motor horsepower 1/2 to 3 HP
Motor 4 in submersible motor, Grundfos motor flange
Discharge 1 in NPT; male on DS builds
Minimum well 4 in (4 in)
Check valve Built in
Liquid temperature Up to 140°F (60°C) at the pump end; the motor sets the working limit
Approvals cCSAus and CULDWUS (Grundfos Product Center codes)
Curve tolerance ISO 9906
Included Pump end only; motor and its control ordered separately
Models & Performance — Will It Do What You Need?

Each table reads like the curve: the head the pump end on its matching motor adds at shut-off, along its curve and at the rated flow of 5 GPM, out to the end of the published curve. Pick a model whose head at your flow covers the pumping level, the pressure you need at the surface (2.31 ft per psi) and pipe friction.

Model HP 0 GPM (Shut-off) 1.4 GPM 3.4 GPM 5 GPM (Rated) 6.8 GPM (Max)
5S05-9 1/2 252 244 217 184 115
5S05-13 1/2 359 347 306 258 157
5S07-18 3/4 499 480 424 357 219
5S10-22 1 609 589 520 439 270
5S15-26 1-1/2 726 703 623 529 329
5S15-31 1-1/2 813 792 681 585 334
5S20-39DS 2 1020 990 849 730 412
5S30-48DS 3 1260 1230 1059 909 521

Total head in feet. The shut-off and flow columns are read from the Grundfos 60 Hz curves, digitized from the published vector curves in the Grundfos SP 5S data sheet (60 Hz), at the nearest published point and rounded down. The (Rated) column is the nominal head Grundfos prints for each model at its rated flow, verbatim; where two figures are shown, builds on different motors or voltages differ slightly. 1 ft of head = 0.433 PSI. Full curves are in the product images and on the Data Sheet tab.

Motor by Horsepower

Motor HP Motor Models
1/2 HP 4 in 5S05-9, 5S05-13
3/4 HP 4 in 5S07-18
1 HP 4 in 5S10-22
1-1/2 HP 4 in 5S15-26, 5S15-31
2 HP 4 in 5S20-39DS
3 HP 4 in 5S30-48DS

Grundfos US price list, January 2026. Grundfos motors for these builds are on our Grundfos MS 4 in motor listing. Add the motor's control: a control box for a single-phase 3-wire motor, a starter or drive for a three-phase motor.

What It Delivers on a 30/50 Pressure Switch

Output at 30 and 50 PSI · 1/2 to 1-1/2 HP · 6 models · depths 20 to 800 ft

GPM at 30 PSI (switch cut-in), by depth to pumping water level

Model 20 ft 100 ft 160 ft 220 ft 300 ft 520 ft 800 ft
5S05-9* — 5 2.5 — — — —
5S05-13 — 6.3 5.4 4.2 — — —
5S07-18 — 7.0 6.3 5.7 4.7 — —
5S10-22 — — 6.8 6.3 5.6 2.1 —
5S15-26 — — — 6.7 6.1 4.2 —
5S15-31 — — — 7.0 6.5 5.1 0.9

GPM at 50 PSI (switch cut-out), by depth to pumping water level

Model 20 ft 100 ft 160 ft 220 ft 300 ft 520 ft 800 ft
5S05-9* 6 3 — — — — —
5S05-13 6.8 5.6 4.6 2.6 — — —
5S07-18 — 6.5 5.8 5.1 3.9 — —
5S10-22 — 7.0 6.4 5.9 5.1 — —
5S15-26 — — 6.9 6.4 5.8 3.6 —
5S15-31 — — 7.1 6.7 6.2 4.7 —
Output at 30 and 50 PSI · 2 to 3 HP · 2 models · depths 300 to 1100 ft

GPM at 30 PSI (switch cut-in), by depth to pumping water level

Model 300 ft 400 ft 460 ft 600 ft 800 ft 900 ft 1100 ft
5S20-39DS* — 6 6 4.5 3 1.5 —
5S30-48DS* — — 6.5 6 4.5 4 2

GPM at 50 PSI (switch cut-out), by depth to pumping water level

Model 300 ft 400 ft 460 ft 600 ft 800 ft 900 ft 1100 ft
5S20-39DS* 6.5 6 5.5 4.5 2.5 — —
5S30-48DS* — 6.5 6.5 5.5 4 3.5 1.5

Printed values: copied as printed from the Grundfos 5 gpm easy selection chart (SQ, SQE, SmartFlo and SP data booklet, 60 Hz, pp. 53–54), in GPM by depth to pumping water level at the pressure shown. Grundfos notes the values are approximate. They track the published curve at depth plus pressure head, so riser and pipe friction are not allowed for; add them on a long or small-diameter drop. A dash means Grundfos prints no value at that depth: on the shallow side the pump runs past the end of its curve, on the deep side it cannot reach that pressure. * Calculated, not printed: Grundfos prints no chart row for 5S05-9, 5S20-39DS, 5S30-48DS. Those cells are the flow where the published 60 Hz curve meets the depth plus 69 ft (30 PSI) or 116 ft (50 PSI), interpolated between published points and rounded down to 0.5 GPM.

Before You Buy — The Limits That Decide the Fit
Check What to confirm
Motor A 4 in submersible motor of the horsepower in the selector, with a Grundfos motor flange; ordered separately
Motor control Control box for a single-phase 3-wire motor; starter or drive for a three-phase motor
Well size Casing ID at least 4 in
Duty point Choose the model from the Grundfos curve at your flow and total head. Send us the pumping level, pipe run and pressure and we will check it against the curve
Materials of Construction
Part Material
Pump Stainless steel, EN 1.4301 (AISI 304)
Impellers Stainless steel, EN 1.4301 (AISI 304)

Source: Grundfos Product Center.

For engineering-led sizing and selection support or a factory submittal, email sales@watermainsupply.com or call 1-888.510.4036.
© Watermain Supply — A division of E4 Industrial LLC